Similar Projects
The Knauf Group Industrial Building / McGregor
New Construction - 600,000 SF
Conception
$322,000,000 est. value
McGregor, TX

Speegleville Bridge Addition (Middle Bosque River) - City of Waco
Addition, Demolition, Infrastructure
Conception
$6,700,000 CJ est. value
Waco, TX 76712

GSA Downtown
Renovation - 5,300 SF
Design
$300,000 est. value
Waco, TX 76701

Baylor University Foster 2nd and 3rd Floor Office Infill
Renovation - 623 SF
Design
$75,000 est. value
Waco, TX 76706

Bridge Maintenance
Infrastructure
Bidding
$3,866,706 CJ est. value
Waco, TX 76710

Bridge Maintenance
Infrastructure
Bidding
$3,866,706 CJ est. value
Waco, TX 76710

2021 31st and Gurley Street Improvements Project
Infrastructure
Post-Bid
Beverly Hills, TX 76711

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Waco Parking Lot Repair
Results
$72,500 est. value
Waco, TX 76705

2021 Group Seal Coat Program
Results

Zoe Luxury Apartments
New Construction, Infrastructure - 100,000 SF
Construction
$18,014,224 CJ est. value
Lacy Lakeview, TX 76705

Ava Warehouse
New Construction, Infrastructure - 6,294 SF
Construction
$280,000 CJ est. value
Hewitt, TX 76643

New Waco High School
New Construction, Infrastructure
Pending Verification
$119,000,000 CJ est. value
Waco, TX 76710

New Waco High School
New Construction, Infrastructure
Pending Verification
$119,000,000 CJ est. value
Waco, TX 76710

Proposed Fire Station 15 - City of Waco
New Construction, Infrastructure - 8,200 SF
Conception
$4,089,000 CJ est. value
Waco, TX 76701

Last Updated 09/27/2022 10:33 AM
Project Title

Envision Offers Warehouse

Physical Address View project details and contacts
City, State (County) Lorena, TX 76655   (McLennan County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Office, warehouse, and parking. As of September 27, 2022, this project is in the construction documents phase. The owner plans to select a general contractor through an invited bidding process, but a timeline for that process has not yet been established. A timeline for construction has yet to be announced.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents