Similar Projects
Reported | 03/26/2021 12:00 AM |
Project Title | 263B Crane Repairs |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53207 (Milwaukee County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Jones Island Water Reclamation Facility, this project will replace three (3) rotary limit switch assemblies in use on a single sludge screening crane because the existing switches have reached the end of their useful life. The new rotary limit switches will have the same capabilities as the original Gemco switches. The Contractor will: 1. procure three (3) new rotary limit switches; 2. remove and dispose of the three (3) existing rotary limit switches, one at a time as necessary to avoid outages; 3. install and fully configure the new rotary limit switches with crane operator input; 4. complete a 7-day test run for each limit switch; and 5. perform other work described in the specifications as necessary to complete the project. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |