Similar Projects
Last Updated | 01/05/2021 05:32 PM |
Project Title | Caloosahatchee Canal Rehab L-3 |
Physical Address | View project details and contacts |
City, State (County) | Fort Myers, FL (Lee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location No. 1: L-3 Canal Weir -Miscellaneous clearing and grubbing, dewatering and bypass pumping as needed, excavation and filling for a new weir, bank protection, concrete control structure and Stormwater piping and restoration. Location No. 2: Pine Street Drainage Structure Modification - Miscellaneous clearing and grubbing, excavating, and filling, modification of an existing drainage structure, new concrete sump and restoration. Location No. 3: Customs Drive Dry Retention Treatment Facility - Miscellaneous clearing and grubbing, excavation and filling, concrete control structure with discharge piping underdrain pipe system, rip-rap blanket, gravel access drive and restoration. Location No. 4: Honda Drive BMP Improvements - Miscellaneous clearing and grubbing, excavation and filling, concrete curb wall and flume, modification of an existing control structure, bio-retention bed with special media and shell rock layer, underdrain system and restoration. Location No. 5: Dana Drive Dry Retention Treatment Facility - Miscellaneous clearing and rubbing excavating and filling, modification of and existing drainage structure, underdrain pipe system, riprap blanket at the existing control discharge and restoration. Canal Bank Restoration: Clear the existing canal bank, bottom, and slopes identified as Section 1 to 4 shall be cleared and debris removed. Clearing and grubbing shall be limited to low lying nuisance vegetation and shrubs, and debris removal. Native trees shall remain. Incidental filling and grading shall be completed with soil stabilization prior to being seeded and mulched by spray application. Seed shall be sufficiently watered until establishment of root material. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |