Similar Projects
Yorkfield Detention Basin Wall Detention Basin Wall Repairs - City of Elmhurst
Infrastructure
Conception
$250,000 est. value
Elmhurst, IL

75th Street Water Main Replacement Project
Alteration
Bidding
$800,000 est. value
Woodridge, IL 60517

Nike Sports Complex Ballfield Hub Water Service Replacement
Infrastructure
Bidding
$200,000 est. value
Naperville, IL 60563

DuPage County Jail Lock Rehabilitation
Renovation
Post-Bid
Wheaton, IL 60187

Fire Hydrant Maintenance and Flow Testing
Post-Bid
Downers Grove, IL

Water Main Replacement
Results
Less than $1,700,000 est. value
Glendale Heights, IL 60139

Water/Sewer System Supplies
Results
Lombard, IL

Entry Plaza
Infrastructure
Bidding
$460,000 est. value
Addison, IL 60101

75th Street Watermain Lining
Post-Bid
$100,000 est. value
Willowbrook, IL

Sunnyside Road, Pierce Avenue, Bryn Mawr Avenue and Sycamore Avenue Water Improvement
Results
Roselle, IL

Water Distribution Valve Assessment Services
Post-Bid
Downers Grove, IL

2021 Water Main Replacement Program
Renovation
Results
Roselle, IL 60172

Valve Assessment Program
Post-Bid
Elmhurst, IL

2021 Watermain Improvements
Results
Elmhurst, IL

2021 Naperville Heights Water Main Replacement
Post-Bid
Naperville, IL

Last Updated 06/23/2022 10:38 AM
Project Title

Public Work Phase III and Other Improvements - City of Elmhurst

Physical Address View project details and contacts
City, State (County) Elmhurst, IL 60126   (DuPage County)
Category(s) Government/Public, Sewer and Water
Sub-Category(s) Prison/Jail, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2025
Bids Due View project details and contacts
Estimated Value $2,475,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and renovation of a mixed-use development in Elmhurst, Illinois. Conceptual plans call for the renovation of a municipal facility; detention facility; and for site work for a water / sewer project. Phase III of the construction of the PW Maintenance Facility budgeted for 2025 is for the relocation of the existing cul-de-sac to the south, construction of an open yard to stock pile materials, nonheated storage and required stormwater detention. As of June 22, 2022, this project is included in the City of Elmhurst FY 2022 - 2026 CIP and funding is allotted for 2024 and 2025. Construction is planned for 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Prison/Jail, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents