Similar Projects
Replace Two HVAC Systems located in Building 1001
Design
$1,000,000 to $5,000,000 est. value
Fort Hood, TX

HVAC Control System Replacement Project
Results
Pflugerville, TX

HVAC Replacement Project
Results
Less than $301,000 est. value
TX

OCB Chiller Maintenance Service
Results
Houston, TX

Chiller Replacement
Results
$500,000 to $1,000,000 est. value
Midland, TX 7971

Emergency HVAC Replacement
Results
Austin, TX

4th Floor Renovations and AHU Replacement
Results
Fort Worth, TX

Cooling Tower Maintenance, Inspections, and Other Services
Results
San Antonio, TX

Chiller Replacement at Lyndon B.Johnson Hospital
Results
Less than $4,470,040 est. value
Houston, TX

Remove and Replace Duct Insulation
Results
Houston, TX

HVAC Optimization and Replacement
Results
Sachse, TX 75048

Vehicle Exhaust Extraction System
Results
Houston, TX 77000

FWCC Air Handler Unit Replacement
Results
$845,000 est. value
Fort Worth, TX

HVAC Unit Replacement - BOT
Results
$111,800 est. value
Huntsville, TX 77320

Head Start HVAC Upgrades
Results
$240,000 est. value
San Antonio, TX

Reported 02/23/2019 12:00 AM
Project Title

E--Replace 1A and 1B HVAC Admin Bldg

Physical Address View project details and contacts
City, State (County) Uvalde, TX 788014563   (Uvalde County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations (RFQ)
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Consist of labor, equipment, supplies, and materials from a company who have experience with Heating, Ventilation and Air Conditioning (HVAC). Work will consist of removing existing Two York Heating and Air Conditioning systems (Designation 1A and 1B) that serves the hatchery building's Office areas, the quality control lab, breakroom, storage areas and rest rooms. Install new 208 and 120 volt branch circuits (Circuit breaker and conductors in conduit) for the new replacement HVAC systems with hail guards.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents