Similar Projects
J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Rehabilitation of 6.0 MG Celestial Ground Storage Tank
Results
Dallas, TX

Upgrade 1000 Gallon Trinity Container
Results
San Antonio, TX

Ground Storage Tank Replacement
Post-Bid
TX

Water Supply and Storage Facility Expansion
Results
Katy, TX 77493

Replace Water Storage Tank with Feed Water System
Post-Bid
Brownwood, TX

Steven M. Clouse Water Recycling Center Underground Storage Tank Removal Project
Results
$134,700 est. value
San Antonio, TX 78275

Proposed Elevated Storage Tank
Infrastructure
Post-Bid
TX

2021 Water Plant Improvements
Infrastructure
Results
Spring, TX 77389

Corbett Ground Storage Tank
Infrastructure
Post-Bid
$300,000 est. value
Schertz, TX

Eagle Street Elevated Storage Tank Rehabilitation
Infrastructure
Results
$450,000 est. value
Weimar, TX

North Belton 1.0 MG Composite Elevated Water Storage Tank
Infrastructure
Results
$3,158,600 est. value
Belton, TX

0.5 Mg Apache Elevated Storage Tank Rehabilitation 51-06-22
Infrastructure
Results
$1,400,000 est. value
Temple, TX 76501

Reported 07/01/2022 09:59 AM
Project Title

West Side Water Tower - City of Bryan

Physical Address View project details and contacts
City, State (County) Bryan, TX 77807   (Brazos County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project calls for construction of a new 190 foot water tower that will be built near Chick Lane between Leonard Road and West Villa Maria Road. As of June 30, 2022, this project is in the conceptual phase. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents