Similar Projects
Last Updated | 11/17/2022 06:37 AM |
Project Title | Sawgrass Wastewater Treatment Plant Train a - Ras and Was Pump Replacements |
Physical Address | View project details and contacts |
City, State (County) | Sunrise, FL 33351 (Broward County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,586,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work for this project consists of, but is not limited to providing all labor, equipment and materials for the construction of the Sawgrass Wastewater Treatment Plant Train A return activated sludge (RAS) and waste activated sludge (WAS) pump replacements. The project includes, but not limited to, the following: Removal and replacement of return activated sludge and waste activated sludge pumps, aboveground discharge/suction piping, valves, appurtenances, pipe supports, pump base, including electrical provisions and controls; removal and replacement of seal water systems including piping, valves, and fittings; removal and replacement of 120-volt sump pump, sump pit, piping, and pipe supports, as shown on the drawings and specifications, and as described and specified in the Technical Specifications and Contract Drawings, in strict accordance with the Contract Documents. Bid Bond 5% |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |