Similar Projects
Deer Park Municipal Airport Sanitary Sewer Extension
Infrastructure
Bidding
$200,000 CJ est. value
Deer Park, WA 99006

Wastewater Lift Station 8 Upgrade
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Woodland, WA 98674

FX Hydronic Pipe and Valve Replacements
Renovation
Sub-Bidding
$623,500 CJ est. value
Bellingham, WA 98225

CRC Mechanical Room Leak Mitigation
Renovation
Sub-Bidding
$40,000 CJ est. value
Olympia, WA 98505

Ductile Iron Pipe
Alteration
Post-Bid
Everett, WA

Residential Plumbing South
Term Contract
Post-Bid
$4,000 est. value
WA

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

URGENT Residential Plumbing Repair
Alteration
Results
Spanaway, WA

Oroville Elementary Restroom Remodel
Build-out
Sub-Bidding
$290,000 CJ est. value
Oroville, WA 98844

Residential Plumbing North
Term Contract
Post-Bid
$7,500 est. value
WA

MHR - Urgent Residential Plumbing Repairs
Alteration
Results
$2,950 est. value
WA

Structural Leak Joint Sealant and Grouting Repairs Work Order
Alteration
Post-Bid
WA

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, Washington
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bridgeport, WA 98813

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

Last Updated 03/15/2023 05:04 PM
Project Title

2023 Water System Improvements

Physical Address View project details and contacts
City, State (County) Mukilteo, WA 98275   (Snohomish County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,122,572 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of three schedules of work. Schedule A consists ofthe installation of approximately 2,100 linear feet of 8-inch ductile iron water main for the replacement ofthe existing 6-inch and 8-inch cast iron water main on 3rd Street, Church Avenue, 5th Street, Webster Street, and 6th Street as shown on the Plans and as described in the Specifications. Schedule A also includes installation of new water services, hydrants, valves, blowoff assembly, 48-inch diameter sewer saddle manhole, connections to existing water system, hot mix asphalt trench patch, and general restoration. Schedules A and B both provide for roadway improvements consisting of a full width 2-inch grind and hot mix asphalt overlay and pavement markings. Schedule C consists of pavement repair at the District headquarters facility The Work shall be substantially complete within 50 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the District Manager, District Office, Mukilteo, Washington. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "Mukilteo Water and Wastewater District" and in. an amount of not less than five percent (5%) of the total Proposal amount Financing of the Project, has been provided by Mukilteo Water and Wastewater District, Washington. The Mukilteo Water and Wastewater District, expressly reserves the right, to reject any or all Proposals and to waive minor irregularities or informalities m any Proposal.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents