Similar Projects
Goraleigh Chiller
Bidding
Raleigh, NC

Security, Lighting, and HVAC Controls
Post-Bid
Raleigh, NC

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Chiller and Air Handler
Results
Less than $33,739 est. value
Raleigh, NC

Bard Wall Mount Heat Pump - 3.5 Ton
Results
Less than $55,860 est. value
NC

Air Conditioning Equipment
Post-Bid
Raleigh, NC 27603

Bard Wall Mount Heat Pump - 3 Ton
Results
Less than $33,190 est. value
Raleigh, NC

Heating and Air Equipment
Post-Bid
Raleigh, NC 27603

Chiller Replacement - Lee Hall
Results
Less than $600,000 est. value
Raleigh, NC

Pullen Aquatic Center HVAC Improvements
Post-Bid
Raleigh, NC 27606

Replace Chilled Water Coils
Results
Less than $130,347 est. value
Raleigh, NC 27601

DPS - Morrison Aggrey Dorm Heating System Replacement
Post-Bid
Raleigh, NC 27699

HVAC Equipment at North Carolina State Lab of Public Health
Term Contract
Results
Less than $15,986 est. value
Raleigh, NC 27607

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

Fuquay Varina Middle School Chiller Replacement
Results
Fuquay-Varina, NC 27526

Last Updated 07/15/2020 03:17 PM
Project Title

HVAC Water Treatment Installation and Repair

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27610   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Water Treatment Installation/Repair (JOC) - Contractor must carry appropriate licenses and/or certifications. Contractor shall have adequate and qualified staff in order to provide WCPSS with the service and/or response time requested. Must be able to handle multiple calls at one time, respond on a 24 hour, 7 day basis, and will be expected to respond to emergency requests within 2 hours. Contractor must be familiar with HVAC equipment manufacturer's recommended procedures for maintaining, cleaning, flushing, and filtering of HVAC systems. Primary tasks of this contract will be but not limited to the following: Chemical cleaning of HVAC system components such as Plate and Frame heat exchangers, condensers, etc. for contaminant removal. Replacement of chemical controllers, chemical feed pumps and other hardware as requested; provide storage capabilities for Closed Loop solutions and re-injection if required; installation of glycol solutions or thermal fluids into Closed Loop systems requiring low temperature thermal protection. Contractor must adhere to industry safety standards for hand ling and disposal of chemicals, containers, etc. and provide MSDS sheets for all chemicals used in Install/Repairs.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents