Similar Projects
Window Replacement and Facade Repairs at Beatley Library
Bidding
Alexandria, VA 22304

Roof, Window, Door and Lighting Replacements Project Animal Husbandry Barn Building 0550
Bidding
Blacksburg, VA 24060

Caulking for Windows at the Meyera E. Oberndorf Central Library
Post-Bid
Virginia Beach, VA

City Hall Painting and Window Repair Project
Post-Bid
Alexandria, VA

CP Door Removal and Installation
Results
Norfolk, VA

Overhead, Roll Up, Folding and Bay Door Testing, Inspection and Repair
Term Contract
Results
Arlington, VA 22204

Administration Building Window and Cornice Repainting
Bidding
Chesterfield, Richmond, VA 23235

GWMP: ARHO INT Storm Window Inserts
Post-Bid
Arlington, Fort Myer, VA 22211

Transit Maintenance Overhead Steel Roll Up Doors
Results
$46,000 est. value
Blacksburg, VA 24060

Five Below
Renovation - 8,118 SF
Post-Bid
Winchester, VA 22601

Removal and Replacement of Sliding Glass Doors
Results
Chesapeake, VA 23322

Doors Flush Lauan Unfinished Hollow Core Veneer Slab
Post-Bid
Norfolk, VA 23510

Detention Doors, Frames, and Hardware
Results
State Farm, VA 23160

Window Film for Senior Center and Two Voter Registrar Locations
Post-Bid
Yorktown, VA 23690

Glass/Glazing Services
Term Contract
Results
Radford, VA 24142

Last Updated 12/22/2020 05:10 PM
Project Title

Window Restoration for VSDB Main Hall Exterior Renovation

Physical Address View project details and contacts
City, State (County) Staunton, VA   (Augusta County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is the restoration of the exterior envelope of Main Hall, a historic mid-nineteenth century Jeffersonian Greekrevival building listed on the National Register as well as the Virginia Landmarks Register. Exterior walls are composed of a rubble stone base, brick middle, and stucco entablature. Wood windows and original glazing are to be restored or replicated to match adjacent historic construction. Exterior infrastructure will be completely replaced and upgraded to be compliant with all contemporary codes. The building is approximately 56,000 GSF, 4 stories above grade and 58 feet high. The project includes the restoration of approximately 220 wood windows. Main Hall will be occupied during construction by a limited number of administrative staff and will function as the “front door” of the institution as well as the administrative offices [business use with incidental assembly and storage] of a functioning K-12 learning facility for students with specific disabilities.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents