Similar Projects
Waste Water Treatment Plant Dewatering Facility
Bidding
Alamogordo, NM 88201

Wastewater Lift Station SJ-3 Replacement
Post-Bid
Ohkay Owingeh, NM

Tesuque Pueblo Wastewater Expansion
Post-Bid
Less than $2,500,000 est. value
Tesuque Pueblo, NM 87505

Anapra Stormwater Pump Station Improvements Phase I
Results
$500,000 est. value
Sunland Park, NM

Pressure Zone Optimization Improvements Phase II
Results
Santa Fe, NM

Transfer Station and Water Service Meter Installation
Post-Bid
Pueblo of Acoma, NM

Design Build Project Delivery Services Santa Fe County Water Reclamation Facility
Results
Santa Fe, NM

Lift Stations and Force Mains
Post-Bid
Ruidoso, NM 88345

Airport Booster Station Improvements
Results
Less than $605,000 est. value
Las Cruces, NM

Repair of Pump House and Implementation of PER Alternative C
Post-Bid
Regina, NM 87046

Lagoon Transfer and Westside WWTP Upgrades
Results
Albuquerque, NM

Wastewater Treatment Plant UV Disinfection Unit (Design/Build)
Post-Bid
Aztec, NM 87410

Lift Station 15 Crane System Replacement
Results
$2,713,157 est. value
Rio Rancho, NM

Design, Equipment and Installation of an Odor Control for Lift Station 14.2
Post-Bid
Rio Rancho, NM 87124

Alto Lakes W&SD Waste Water Treatment Plant Improvements
Results
Less than $829,257 est. value
Alto, NM

Last Updated 12/21/2018 09:23 AM
Project Title

Wastewater Treatment Plant and Lift Station Improvement

Physical Address View project details and contacts
City, State (County) Truth or Consequences, NM   (Sierra County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Project consists of the following improvements to the Wastewater Treatment Plant (WWTP) and sewer lift stations: WWTP Construction of new aerobic digesters with associated piping, earthwork, concrete, electrical, and instrumentation. The new digesters include blowers, air diffuser equipment, controls, air piping, pumps, and valves. The digesters will be constructed with concrete and will include walkway, handrails and stairs. Instrumentation work includes controls and updates to existing Supervisory Control and Data Acquisition (SCADA) system. Sewer Lift Stations Construction of improvements to three existing sewer lift stations and one vacuum sewer station. Improvements include new pumps, controls, piping, valves, valve vaults, emergency generators, wet well concrete rehabilitation, site security upgrades and updates to existing SCADA. A new mechanical screen, biofilter and electrical building are included for the Clancy Lift Station
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents