Similar Projects
Construction of Water Mains 8” Main/Pershing Avenue Lincoln Avenue to 5th Avenue
Bidding
$750,000 est. value
Lebanon, PA 17042

Paradise, Sawmill & Leesway Crossings
Bidding
Towanda, PA 18848

Polyethylene Pipe
Post-Bid
Greensburg, PA 15601

Copper Pipe
Post-Bid
New Stanton, PA 15672

Backwater Valve Maintenance Contract
Results
Pittsburgh, PA

Sanitary and Storm Water Cipp Project
Results
Lock Haven, PA 17745

Bartram's Mile Maintenance Building and Water Service Extension
Renovation
Construction
$43,000,000 est. value
Philadelphia, PA 19143

Hecktown Road Water Main Relocation
Bidding
Bethlehem, PA 18018

Judicial Center - Water Intrusion Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Harrisburg, PA 17120

Construction of the Glendale Valley Municipal Authority's Church Hill Water Interconnection Bore
Results
Flinton, PA

Water Main Work
Bidding
Bethlehem, PA 18018

Upgrade and Replacement of the Water Systems Existing SCADA Telemetry System
Post-Bid
Howard, PA 16841

HRR AC Waterline Replacement
Results
Rochester, PA

Capitol Complex East Wing Water Intrusion Repairs
Bidding
$3,000,000 est. value
Harrisburg, PA 17120

Excavation Work for Water Leaks and Other Borough Related Road Work
Post-Bid
Westover, PA 16692

Last Updated 01/20/2021 03:17 PM
Project Title

General Construction - Full Service Hook-UPS - Prince Gallitzin State Park

Physical Address View project details and contacts
City, State (County) Patton, PA 16668   (Cambria County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Relocating PVC water main; water service connections and yard hydrants; connections to water system; PVC sewer main; lateral connections; connections to sewer system; macadam camper pad extensions; gravel living areas; French drain, and perforated pipe. Also preconstruction photographs/video; mobilization and erosion control; temporary utilities and sanitary facilities; traffic maintenance and protection; clearing, grubbing, and stockpiling topsoil; construct water main, valves, and appurtenances; provide water services and yard hydrants; conduct required disinfection/leakage testing; tie into water system; construct sewer main, manholes, cleanouts, and appurtenances; provide laterals and dump stations; conduct testing on all mains, laterals, and manholes; tie into sewer system; construct drainage improvements; and restore disturbed areas.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents