Similar Projects
Avon Hotel
New Construction - 101,405 SF
Conception
$10,000,000 CJ est. value
Avon, CO 81620

Redevelopment of 460 Trail Gulch Road
Infrastructure
Bidding
$1,347,507 est. value
Gypsum, CO 81637

Regionwide Replacement of Pavement Markings
Infrastructure
Bidding
$5,000,000 to $20,000,000 est. value
Edwards, CO

Parking Lot Maintenance Services
Post-Bid
CO

General On-Call Asphalt Infrared Repair Services
Post-Bid
Eagle, CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Improvements
Results
Vail, CO

Vail Residence Inn by Marriott
New Construction, Demolition - 149,000 SF
Construction
$60,000,000 est. value
Vail, CO 81657

Two Rivers Road Improvements
New Construction
Construction
Basalt, CO 81621

R3 Fy 23 Region Wide Roundabout Striping
Infrastructure
Bidding
$1,000,000 est. value
Edwards, Mesa, Pitkin, CO 81241

Fenno Wellhouse Replacement
Post-Bid
Vail, CO 81657

Avon Road Improvements Between Roundabouts 1 and 2
Results
Less than $1,000,000 est. value
Avon, CO 81620

Avon Hotel - Springhill Suites and Townplace Suites
New Construction - 131,450 SF
Construction
Vail, CO 81657

Dog Park at Buckhorn Valley
Infrastructure
Bidding
$700,000 est. value
Gypsum, CO 81637

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Reported 06/30/2022 04:25 PM
Project Title

The Hoffmann Hotel

Physical Address View project details and contacts
City, State (County) Carbondale, CO 81623   (Eagle County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $30,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is part of the Tapestry Collection by Hilton. As of June 29, 2022, a building permit has been issued. The general contractor has been identified, but the construction schedule has not been confirmed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Hotel/Motel, 4 Stories Above Grade, Approximately 77,000 SF New Construction, 122 Unit(s).
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents