Similar Projects
Stunner Bridge Repair
Renovation
Design
$500,000 to $1,000,000 est. value
Monte Vista, CO

Jordan Road - Roadside Improvements - Hess Road to Bradbury Parkway
Infrastructure
Bidding
$200,000 est. value
Parker, CO 80138

2022 Road Repairs and Surfacing
Infrastructure
Bidding
$500,000 est. value
Castle Rock, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Peoria Street Widening Project
Results
Less than $1,058,887 est. value
Castle Rock, CO

2020 Road Repair Project
Results
Castle Rock, CO 80108

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2021 Woodmoor Mountain Road Project
Infrastructure
Post-Bid
CO

2021 Townwide Resurfacing Program
Results
Parker, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

2021 Street Overlay
Results
Lone Tree, CO

Last Updated 05/03/2022 10:05 AM
Project Title

CMGC services for the Crystal Valley Interchange Project

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following bridges/culverts and roadways: ? Crystal Valley Pkwy over I-25 ? Crystal Valley Pkwy over Burlington Northern and Santa Fe (BNSF) Railroad ? North Bound I-25 on ramp over Douglas Run Drainage ? East Frontage Rd over Douglas Run drainage ? Crystal Valley Pkwy from existing bridge structure at Plum Creek to interchange ? Crystal Valley Pkwy from interchange to Dawson Ridge Blvd ? Relocation of the East Frontage Rd ? Connection stubs to Dawson Ridge Blvd ? On/Off ramps for north bound I-25 ? On/Off ramps for south bound I-25

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents