Similar Projects
Ingrando Park Parking Lot - F-000851 - City of Houston
Infrastructure
Conception
$1,220,000 est. value
Tampa, FL 33606

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Design
$175,000,000 CJ est. value
Tampa, FL 33605

Gas Worx - Phase 1
New Construction, Infrastructure - 20,000 SF
Design
$175,000,000 CJ est. value
Tampa, FL 33605

RFP D/B - US Business 41
Infrastructure
Bidding
$40,000,000 CJ est. value
Thonotosassa, FL 33592

RFP D/B - US Business 41
Infrastructure
Bidding
$40,000,000 CJ est. value
Thonotosassa, FL 33592

Forest Brooke Subdivision, Collector Road 2nd Extension Phases 2 and 3 - Site Development
Post-Bid
Wimauma, FL

CDBG Street Resurfacing
Post-Bid
Plant City, FL

I-75 Big Bend Road
Results
FL

I-75 MLK DDI
Results
FL

The Motor Enclave
New Construction - 16,000 SF
Construction
$100,000,000 est. value
Tampa, FL 33610

Construction Services - Enterprising Latinas
Construction
Wimauma, FL 33598

North 17th Street Multifamily Development
New Construction, Infrastructure - 79,250 SF
Pending Verification
$22,000,000 CJ est. value
Tampa, FL 33605

North 17th Street Multifamily Development
New Construction, Infrastructure - 79,250 SF
Pending Verification
$22,000,000 CJ est. value
Tampa, FL 33605

East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

Union Park, Phase 7F
Post-Bid
FL

Last Updated 10/01/2022 09:01 AM
Project Title

Sidewalk Construction (Citywide)

Physical Address View project details and contacts
City, State (County) Tampa, FL 33602   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,500,840 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Sidewalk Construction - Citywide The work will generally consist of, but may not be limited to: o Removal and replacement of sidewalk, curb, and various sidewalk appurtenances o Clearing and grubbing, including removal and disposal of all material generated o Grade work, including grading of slopes and relocation of swales and ditches o Root pruning and installation of root barriers as required o Tree removals o Incidental repair or "capping" of irrigation sprinkler systems o Construction and/or restoration of ADA compliant sidewalk ramps o Incidental removal and replacement of asphalt and other roadway components o Installation of metal handrail, sidewalk bell footers, and retaining walls o Installation of drainage pipe and appurtenances o Installation of driveway pavers and architectural sidewalk pavers o Utility coordination and minor utility work incidental to the construction o Maintenance of Traffic (MOT) incidental to the construction o Installation of sod o Complete restoration of construction sites o Response to Citizen concerns and questions about construction o Secure necessary paperwork to access private property when needed o Property stake (property line) identification o Distribution of door hangers at homes at the site of sidewalk construction o Minimal site surveying Questions are to be e-mailed to ContractAdministration@tampagov.net.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents