Similar Projects
Middletown Community Center - City of Middletown
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Middletown, OH 45044

Anderson Farm Residential Subdivision
New Construction, Infrastructure
Conception
$2,300,000 CJ est. value
West Chester, OH 45069

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

SR 126 Resurfacing, Undivided System
Infrastructure
Design
$2,800,315 CJ est. value
Hamilton, OH 45013

RFQ D/B - Dry Fork Streambank Stabilization
Infrastructure
Bidding
$488,938 CJ est. value
Hamilton, OH 45011

Bridge Repair
Infrastructure
Bidding
$625,820 CJ est. value
New Miami, OH 45011

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Community Dev Village of Seven Mile Emergency Storm Sewer Replacement
Infrastructure
Post-Bid
$97,798 CJ est. value
Hamilton, OH 45011

World-Wide Water Storage Tank Remediation
Term Contract
Results

API 653 External Tank Inspection
Results

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 492,200 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Freddy's Frozen Custard & Steakburgers / Fairfield
New Construction, Infrastructure - 3,000 SF
Pending Verification
$900,000 CJ est. value
Fairfield, OH 45014

Middletown's Transportation Plan
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Liberty Township, OH 45044

Culvert Replacement - FY23
Infrastructure
Bidding
$396,385 CJ est. value
New Miami, OH 45011

Relay 129 Equalization System Project
Infrastructure
Post-Bid
$394,000 CJ est. value
Hamilton, OH 45011

Last Updated 09/27/2022 01:44 AM
Project Title

2022 Port Union Water Tower Construction Project

Physical Address View project details and contacts
City, State (County) Fairfield, OH 45014   (Butler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,164,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bids cannot be withdrawn for a period of ninety (90) days following the bid opening. The City anticipates the contract will be awarded and the notice to proceed will be issued by early-June 2022. All work must be completed within FIVE HUNDRED AND FIFTEEN (515) calendar days after the issuance of Notice to Proceed. The City of Fairfield reserves the right to reject any or all bids or to correct or waive irregularities in bids should it be deemed in the best interest of the City of Fairfield, Ohio to do so.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents