Similar Projects
Highway Construction - CTH N - STH 59 to County Line - Rock County
Infrastructure
Conception
$8,550,000 CJ est. value
Whitewater, WI 53190

Highway Construction - CTH N - STH 59 to County Line - Rock County
Infrastructure
Conception
$8,550,000 CJ est. value
Whitewater, WI 53190

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

2022 Street Improvement Phase 1
Infrastructure
Post-Bid
$300,000 est. value
Lake Geneva, WI

2022 Road Improvements
Infrastructure
Post-Bid
$600,000 est. value
Lyons, WI

2022 Joint and Crack Cleaning/Sealing
Infrastructure
Results
Lake Geneva, WI

2022 ADA Improvements
Renovation, Infrastructure
Results
$960,000 est. value
Elkhorn, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Meijer / Delavan
Demolition, Term Contract, New Construction, Infrastructure - 160,000 SF
Pending Verification
$30,000,000 CJ est. value
Delavan, WI 53115

Meijer / Delavan
Demolition, Term Contract, New Construction, Infrastructure - 160,000 SF
Pending Verification
$30,000,000 CJ est. value
Delavan, WI 53115

Highway Construction - CTH M - Townline Road to STH 59 - Rock County
Infrastructure
Conception
$500,000 CJ est. value
Whitewater, WI 53190

Multi-Tenant Retail Building
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Whitewater, WI 53190

2022 East Troy Microsurfacing
Infrastructure
Post-Bid
$450,000 est. value
East Troy, WI

Last Updated 09/05/2023 09:38 AM
Project Title

IH 43 Rock Freeway - Wisconsin Department of Transportation

Physical Address View project details and contacts
City, State (County) Elkhorn, WI 53121   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 5, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is likely to begin in Spring/ Summer 2024. *The closed solicitation has been included below for reference: Solicitation ID: SE-01 County : 64 - Walworth County, 67 - Waukesha County Limit : USH 12 TO STH 83 83 NB Anticipated Construction Cost: $25,000,000-$29,999,999 The pavement needs treatment to extend the service life. Perpetuation to resurface 16.50 miles from USH 12 to STH 83 and spot base patching on/off ramps in the counties of Walworth and Waukesha. Consultant to provide bridge design on Bridges B-64-64 (IH 43 NB over USH 12),B-64-86 (Stone School Rd over IH 43), B-64-87 (Miramar Rd over IH 43), B-64-92 (IH 43 NB over Town Line Rd), B-64-98 (IH 43 NB over Hodunk Rd), B-64-110 (IH 43 NB over Sugar Creek), B-67-129 (STH 83 over IH 43) and B-67-130 (IH 43 NB over CN RR). Additional items include rest area improvements, guardrail replacement, culvert pipe repair/replacement, replace existing signing and pavement marking. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - IH 43 Rock Freeway *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents