Last Updated | 09/05/2023 09:38 AM |
Project Title | IH 43 Rock Freeway - Wisconsin Department of Transportation |
Physical Address | View project details and contacts |
City, State (County) | Elkhorn, WI 53121 (Walworth County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $30,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of September 5, 2023, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is likely to begin in Spring/ Summer 2024. *The closed solicitation has been included below for reference: Solicitation ID: SE-01 County : 64 - Walworth County, 67 - Waukesha County Limit : USH 12 TO STH 83 83 NB Anticipated Construction Cost: $25,000,000-$29,999,999 The pavement needs treatment to extend the service life. Perpetuation to resurface 16.50 miles from USH 12 to STH 83 and spot base patching on/off ramps in the counties of Walworth and Waukesha. Consultant to provide bridge design on Bridges B-64-64 (IH 43 NB over USH 12),B-64-86 (Stone School Rd over IH 43), B-64-87 (Miramar Rd over IH 43), B-64-92 (IH 43 NB over Town Line Rd), B-64-98 (IH 43 NB over Hodunk Rd), B-64-110 (IH 43 NB over Sugar Creek), B-67-129 (STH 83 over IH 43) and B-67-130 (IH 43 NB over CN RR). Additional items include rest area improvements, guardrail replacement, culvert pipe repair/replacement, replace existing signing and pavement marking. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - IH 43 Rock Freeway *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |