Similar Projects
100 N. Broadway
New Construction, Infrastructure - 331,863 SF
Design
$70,000,000 CJ est. value
Aurora, IL 60505

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

PIP-II Site Work
Post-Bid
Batavia, IL

2021 Northeast Area Resurfacing
Infrastructure
Post-Bid
Elgin, IL

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

Christina Drive and Higgins Road Improvements
Infrastructure
Results
East Dundee, IL

Asphalt
Infrastructure
Post-Bid
Elburn, IL 60119

Waubonsee Creek Shared Use Path
Infrastructure
Results
Montgomery, IL

Pavement Patching
Infrastructure
Post-Bid
Sleepy Hollow, IL 60118

Windmill Cove Directional Boring and Cable Replacement
Infrastructure
Results
Batavia, IL

Construction Variable Width Pavement Resurfacing
Infrastructure
Post-Bid
East Dundee, IL

Baker Community Center Site Improvements
Infrastructure
Results
Saint Charles, IL 60174

Oak Street, Lincoln Avenue (N), and Lincoln Avenue (S) Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Sugar Grove, IL 60554

Julie Lane Resurfacing
Infrastructure
Results
Hampshire, IL 60140

Asphalt Paving and Repair
Term Contract
Post-Bid
Algonquin, IL

Last Updated 01/02/2023 11:32 PM
Project Title

Roundabout Construction and Roadway Realignment

Physical Address View project details and contacts
City, State (County) Campton Hills, IL 60124   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Roundabout Construction and Roadway Realignment With Hma Full Depth 9.5" (25,405 Sy), Hma Full Depth 11" (6,240 Sy), Agg Subgrade Imp 12" (55,930 Sy), Earth Ex (44,751 Cy), Rdum (57,877 Cy), Furnished Ex (41,268 Cy), Tpsl Ex and Place (33,275 Cy), Concrete Box Culvert (197 Cy), Light Pole+luminaire (20 Ea), Drainage Structures (36 Ea), and Other Related Items of Work. Project Location: Intersection of Bliss Road, Main Street, and Fabyan Parkway | west of Batavia, Kane Count Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. City/County: Kane ILDOT - Roundabout Construction and Roadway Realignment - 14-00288-01-PV

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents