Similar Projects
Corridor Improvement - SC 118 (Hitchcock Parkway)
Results
SC

Rehabilitation - Aiken County
Results
SC

Preservation- Aiken County
Results
SC

Road Pavings In Wagener, Salley, Springfield
Results
Less than $1,808,733 est. value
Aiken, SC

2021 Asphalt Track Resurfacing at Paul Knox Middle School
Results
North Augusta, SC 29841

Rehabilitation - Aiken Co
Infrastructure
Results
SC

Intersection Improvements - US 278
Infrastructure
Results
SC

Ballard Drive Paving
Infrastructure
Results
$673,651 est. value
Aiken, SC 29847

Safety Improvements
Infrastructure
Results

USC Aiken Convocation Center Parking Lot Coating and Stripe
Infrastructure
Results
$100,000 to $150,000 est. value
Graniteville, SC 29829

Preservation - District 7
Infrastructure
Results

Safety Improvements - District 7
Infrastructure
Results

Reconstruction/Rehabilitation - District 2 and 7
Infrastructure
Results

Safety Improvements - S-145 (Aiken Co)
Infrastructure
Results
SC

Rehabilitation - Aiken County
Infrastructure
Results
SC

Last Updated 04/21/2022 06:55 AM
Project Title

Rehabilitation

Physical Address View project details and contacts
City, State (County) SC   (Aiken County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 1,600.000 Sy Borrow Excavation 728.000 Cy Excavation For Shoulder Paving 403.898 Sta Hauling Of Excavated Shoulder Material 403.898 Sta Maintenance Stone 8.600 Ton Hma Shoulder Widening Course 1,987.307 Ton Liquid Asphalt Binder Pg64-22 2,755.348 Ton Full Depth Asph. Pav. Patching 8" Unif 860.000 Sy Milling Existing Asphalt Pavement 2.0" 423,375.000 Sy Milling Existing Asphalt Pavement (Variable) 31,930.000 Sy Milled-In Rumble Strip 11.460 Mi Hot Mix Asphalt Surface Course Type b 47,373.930 Ton Hot Mix Asphalt Surface Course Type d 255.000 Ton Driveway Paving-Surface Type d 520.625 Ton Temporary Construction Signs (Barricade Mounted) 100.000 Sf Permanent Construction Signs (Ground Mounted) 4,060.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 28,205.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 91,325.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 160.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 8,441.000 Lf 12" White Solid Lines - Perm.Pvmt.Markings 120.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 65.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 4,854.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 124.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 71.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 14.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Perm.Pvmt.Marking 2.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 4.000 Ea Handicap Symbol - Perm.Pvmt Marking 9.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 20,360.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 130,750.000 Lf 24" Yellow Solid Lines - Perm.Pvmt.Marking 5,225.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 56,312.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 202,650.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 320.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 16,882.000 Lf 12" White Solid Lines - Fast Dry Paint 240.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 9,478.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 128.000 Ea White Word Message "Only"-Fast Dry Paint 75.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 14.000 Ea White Lane Drop Arrow (Left Or Right)-Fast Dry Paint 2.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea Handicap Symbol - Fast Dry Paint 9.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 40,720.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 259,080.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,925.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 10,450.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 1,556.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 70.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,460.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 405.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 39,200.000 Lf Sawcut For Loop Detector 12,880.000 Lf Adjust Drop Inlet Adjust d. i. 8.000 Ea Detectable Warning Material 800.000 Sf Pedestrian Ramp Construction 1,600.000 Sy Surface Applied Detectable Warning 340.000 Sf Remove & Dispose Semi-Rigid Gr Device 19,335.000 Lf Mt3 Leading End Treatment Tl3 30.000 Ea Mb Trailing End Treatment 19.000 Ea Mgs3 Gr Standard Shoulder 11,175.000 Lf Mgs3cs Gr Compressed Shoulder 6,400.000 Lf Mtbbc3 Mash Thrie-Beam Barrier Connector Tl3 7.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 9.207 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents