Similar Projects
Z--Hofu Upgrade HVAC ,Paint & ore Museum Collection
Design
$1,000,000 to $5,000,000 est. value
Elverson, PA

East Headworks - Heating Ventilating and Air Conditioning HVAC
Bidding
Pittsburgh, PA

New Fayette County Prison - HVAC Construction
Bidding
Uniontown, PA 15401

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Air Handling Replacement Unit
Post-Bid
Altoona, PA 16602

H--Lab/Pharmacy Safety Cabinet (Hood) and Clean Bench Testing
Results
Erie, PA 16504

Granada Building Chiller Replacement
Results
Hershey, PA

HVAC Upgrade Project at Erie Downtown YMCA
Renovation - 110,000 SF
Construction
$113,000 est. value
Erie, PA 16501

Maintenance and Repair of Automatic Temperature Controls
Term Contract
Bidding
Philadelphia, PA

H--Boiler and Chiller Water Treatment Services Pittsburgh VAMC
Post-Bid
Pittsburgh, PA 15420

Supply Heating and Cooling Units
Results
Williamsport, PA

Heating System Drain and Install Glycol Flush
Bidding
Erie, PA 16505

Planned Maintenance of Chillers and Other Cooling Equipment - District Wide
Post-Bid
Pittsburgh, PA 15123

Air Conditioner 10,000 Btu 120 V R410a
Results
Less than $25,000 est. value
Philadelphia, PA

Boiler Plant Decentralization At Glenside Homes
Bidding
Reading, PA 19601

Reported 02/25/2021 12:00 AM
Project Title

Food Service Exhaust Hood Cleaning

Physical Address View project details and contacts
City, State (County) California, PA   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Complete inspection/cleaning/degreasing of system interiors. 2. All cleaning to be accomplished by direct contact brushing, hand scraping, and solvent washing. Guarantee to remove at least 95% of all existing grease, soot, food debris, etc., from the systems. 3. Wash canopy/canopies with degreaser solution and paint, polish if stainless steel. 4. Inspect/degrease duct, riser stack interiors, and accessible ductwork interiors. Existing access panels will be utilized for cleaning/inspecting, whichwill be fitted on air tight covers. Inspect/clean/degrease fans, housing, and exhaust louvers. Fans and housing cleaned through existing clean-out doors or with minor dismantling. 5. Cleaning procedures to include scraping, solvent washing, high pressure detergent washing or other suitable methods. 6. After interior cleaning, coat in the interior of all systems worked on, with special fire retarding compound.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents