Similar Projects
2021 Gas Collection and Control System (GCCS) Expansion at Seminole Road MSW Landfill
Term Contract
Bidding
GA

Gas Tank/Dispenser 5514/22/671
Infrastructure
Bidding
Buchanan, GA 30113

Fuel Management System Upgrade
Post-Bid
Dublin, GA

Sodium Bisulfite Tank Replacement at Pole Bridge Wastewater Treatment Plant
Post-Bid
Lithonia, GA 30038

Thompson Mill Road Natural Gas System Expansion
Results
Less than $467,119 est. value
Warner Robins, GA 31095

Fuel Depot Upgrades
Results
Kingsland, GA 31548

Fleet Fuel Site Improvements Projects
Infrastructure
Bidding
Dacula, Lawrenceville, Lilburn, GA 30044

Underground Fuel Tank Closure and Installation of New Pad Mount Tank
Post-Bid
Marietta, GA 30061

Metal Tank Replacement
Results
Ellijay, GA 30540

Natural Gas System Replacement - Park Ave
Post-Bid
Fort Valley, GA 31030

Maintenance, Cleaning and Inspection of Fuel Tanks Including Removal, Relocation and Installation
Term Contract
Results
Decatur, GA 30030

Fuel Pumps And Controls
Post-Bid
Columbus, GA 31901

Decommission and Remove Terminal Underground Fuel Tank
Results
Savannah, GA 31408

Fuel Management System
Post-Bid
Springfield, GA

Water, Sewer and Natural Gas Main Extensions to Serve the Coca-Cola Bottling Company United (CCBCU) Distribution Center
Results
Less than $887,070 est. value
Tifton, GA

Last Updated 09/30/2021 10:28 AM
Project Title

Natural Gas Plastic Replacement Project

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $411,103
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of replacing approximately 7,950 feet of 2 inch vintage PE with 7,950 feet of new 2 PE, at the locations listed below. • Oglethorpe Colony - Replace approximately 4,200 feet of 2 inch vintage PE main with new 2 inch PE and tie-over or replace approximately 150 service lines. • Stone Mill Run – Replace approximately 3,750 feet of 2 inch vintage PE main with 3,750ft of new 2 inch PE tie-over or replace approximately 55 service lines.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents