Similar Projects
Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Los Angeles Avenue Landscape Renovation and Wall Enhancements - M0046 - City of Moorpark
Infrastructure
Conception
Less than $500,000 est. value
Moorpark, CA 93021

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Los Angeles Convention Center Expansion & Renovation
Addition, LEED Certification, New Construction, Infrastructure, Renovation - 2,200,000 SF
Design
$500,000,000 CJ est. value
Los Angeles, CA 90015

Merritt College New Landscape Horticulture Complex Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$21,200,000 CJ est. value
Oakland, CA 94619

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport
Infrastructure
Bidding
$3,250,000 CJ est. value
Ontario, CA 91761

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

Grading Peoples Basin
Infrastructure
Results
Woodlake, CA 93286

Special Education Portable Site Work - Various Sites
Renovation, Infrastructure
Results
Clovis, CA 93611

Affordable Housing - 415 Natural Bridges Drive - City of Santa Cruz
New Construction, Infrastructure - 10,519 SF
Pending Verification
$2,400,000 CJ est. value
Santa Cruz, CA 95060

180 Permanent Supportive Housing Project
Demolition, New Construction, Infrastructure - 49,961 SF
Pending Verification
$14,000,000 CJ est. value
Santa Cruz, CA 95060

Carmel Mountain Road Fire Station - San Diego Fire-Rescue Department
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
San Diego, CA 92129

Rancho Conejo Boulevard
Renovation, Addition, Demolition - 13,300 SF
Design
$2,000,000 est. value
Thousand Oaks, CA 91320

Palomar Airport Waterline Realignment
Infrastructure
Bidding
$1,640,000 CJ est. value
Carlsbad, CA 92011

Last Updated 08/23/2022 06:02 AM
Project Title

Remove and Replace Septage Tank for Eastside Campground

Physical Address View project details and contacts
City, State (County) Paicines, CA 95043   (San Benito County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

REMOVE AND REPLACE SEPTAGE TANK AT EASTSIDE CAMPGROUND, PINNACLES NATIONAL PARK, SAN BENITO COUNTY, CA The National Park Service, Pinnacles National Park, has a requirement for the removal and replacement of the septage tank at the Eastside Campground. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. Per FAR 36.204, the project range is estimated to be between $250,000 and $500,000. The North American Industry Classification System (NAICS) code is 238910 with a corresponding size standard of $16.5 million of gross annual receipts for the last three years. The Government contemplates award of a firm-fixed price contract resulting from this solicitation. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers that are received from concerns that are not small business concerns, shall not be considered. The work of this project includes but is not limited to, removal of an older 1,500-gallon concrete septage tank at the park's Eastside Campground, and replacement of that tank with a new 15,000-gallon fiberglass tank. The work also includes demolition of the existing 1,500 gallon buried concrete septage tank that is currently connected to the RV dump station. All work is to be performed under a single contract. Delivery: 02/12/2023 Delivery Location Code: 0009060603 NPS, Pinnacles NP 5000 East Entrance Road Paicines CA 95043 US Period of Performance: 09/21/2022 to 02/12/2023Pre-proposal questions shall be submitted a minimum of seven (7) calendar days prior to the due date and time for proposals. Submit questions only through email to: Contract Specialist, Helli Newsom, helli_newsom@nps.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents