Similar Projects
Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

Siphon Pipe
Infrastructure
Bidding
$600,000 CJ est. value
Yuma Proving Ground, AZ 85365

Siphon Pipe
Infrastructure
Bidding
$600,000 CJ est. value
Yuma Proving Ground, AZ 85365

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Valley Vista Water Main Extension
Infrastructure
Post-Bid
Somerton, AZ

Fire Hydrants and Accessories
Results
Yuma, AZ

1st Avenue Waterline Replacement-Court Street to 1st Street
Results
Yuma, AZ 85364

RFQ D/B - Kennedy Skate Park Improvements
Infrastructure
Bidding
$2,500,000 CJ est. value
Yuma, AZ 85364

Medium Coarse Headworks Bar Screen And Washer
New Construction
Post-Bid
Somerton, AZ

Somerton High School Sewer Lift Station
New Construction
Results
Somerton, AZ 85350

Bouse Kofa Dome Tap Gila Reconductoring Construction Project
Infrastructure
Post-Bid
$20,000,000 to $23,000,000 est. value
Yuma, AZ

Arizona Avenue Waterline Replacement - 10th Street to 15th Street
Infrastructure
Results
Yuma, AZ 85364

PVC Plastic Pipe, Fittings and Related Accessories
Infrastructure
Post-Bid
Yuma, AZ

Construction of the Avenue F-1/4 Alignment and Jefferson Street Watermains
Infrastructure
Results
Somerton, AZ

Tacna Water Infrastructure Improvements
New Construction, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Tacna, AZ 85356

Last Updated 08/25/2022 02:04 PM
Project Title

Figueroa Avenue Water Pollution Control Facility Clean Fill Drying Beds

Physical Address View project details and contacts
City, State (County) Yuma, AZ 85364   (Yuma County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,180,148 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 25, 2022, project was awarded to Gutierrez Canales Engineering, awarded amount is $1,180,148.31.** Construction of 2 clean fill drying beds with excess liquid disposal via a pump station, with 800 LF of 3" forcemain, site work, pump, discharge piping, electrical services, controls, and 1,195 LF of 6" water main extension. Placing approximately 2,800 SY of pavement for an all-weather access road. Deadline to submit Questions Jun 8th 2022, 11:00 AM MST

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents