Similar Projects
Sagebriar Planned Unit Development
New Construction, Infrastructure
Design
$200,000,000 CJ est. value
Greenwood, IN 46143

Johnson County Courthouse Exterior Sitework Project
Infrastructure
Bidding
$250,000 CJ est. value
Franklin, IN 46131

Two Cent Road Sanitary Sewer Upgrades Contract 2-2022
Infrastructure
Bidding
$5,000,000 CJ est. value
Bargersville, IN 46106

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

CCMG Street Improvement Program
Infrastructure
Post-Bid
Trafalgar, IN

Road Reconstruction
Infrastructure
Results
$4,389,769 est. value
IN

Commerce Drive, Commerce Parkway and Graham Road Intersection Improvements
Infrastructure
Results
$1,756,421 est. value
Franklin, IN 46131

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Miscellaneous School Projects
Demolition, Infrastructure, Alteration
Post-Bid
Greenwood, IN 46143

Jim Black Road Phase II and III Roadway Improvements
Infrastructure
Results
$1,489,201 est. value
Franklin, IN 46131

Construction Inspection Services US 31 in Johnson County - 1800082 - Indiana Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$42,044,000 CJ est. value
Franklin, IN 46131

2022 Maintenance Improvement Program - Crack Sealing
Infrastructure
Post-Bid
$100,000 est. value
Franklin, IN

2021 RRGCF - Crossing Closure Project at Crossing Academy Street
Infrastructure
Results
Greenwood, IN 46143

Founders Point Apartments
New Construction, Infrastructure - 71,400 SF
Pending Verification
$20,000,000 CJ est. value
Franklin, IN 46131

Last Updated 07/20/2023 09:52 AM
Project Title

Earlywood Sanitary Sewer Extension

Physical Address View project details and contacts
City, State (County) Franklin, IN 46131   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $92,145 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall include: Approximately 230 LF of 8-inch PVC sanitary sewer, 2 manholes, paving, clean-up and restoration and all other work and appurtenances necessary for complete installation. Additionally, the Work shall include connection to an existing manhole. Work shall be constructed under a Unit Price Contract. Bids shall be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each Bid shall be accompanied by the Contractor's Bid Attachment (included with the Contract Specifications) to Form 96, a Financial Statement (completely filled out and signed) and a bid security in the form of an acceptable certified check payable to the Owner or an acceptable Bidder's bond, in an amount of not less than 5% of the total bid price, in accordance with the Contract Specifications. The Contract will be awarded in accordance with the provisions of IC 5-16-13 for Public Works projects awarded after June 30, 2015. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference and Contractor agrees that pursuant to IC 5-16-13-8, the public work project will not be structured other than in the Contractor tier structure required by law. Contractor shall further be required to comply with the provisions of IC 5-16-13-13, 14 in all respects including but not limited to document preservation and availability for inspection. A conditional or qualified bid will not be accepted. Award will be made to the low, responsive, responsible bidder, including but not limited to, the provisions and definitions referenced in IC 5-16-13and IC 5-16-14. For contracts over $300,000.00, in accordance with IC 5-16-13-10 and IC 8-23-10-0.5, Contractor must be qualified under either IC 4-13.6-4 or IC 8-23-10 (Indiana Department of Administration or Indiana Department of Transportation) before doing any Work on a Public Works project. In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner, and contractors of any tier as defined in IC 5-16-13-4, will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify program (effective July 1, 2011), and comply with the reporting requirements of IC 5-16-13-11. In accordance with IC 5-22-16.5, Contractors entering into a contract with the Owner will be required to provide an Indiana Iran Investment Certification. In accordance with IC 5-16-13-11, Contractor shall submit an Employee Drug Testing Plan with their Bid and contractors of any tier as defined in IC 5-16-13-4 must comply with the drug testing requirements set forth in IC 4-13-18. Contractors shall complete a Drug Testing Plan Certification to be submitted with their Bid. The Owner reserves the right to waive any informalities or minor defects in bids or bidding procedure, or reject any and all bids, or to accept the bid from the lowest most responsible and responsive bidder as exclusively determined by the Owner. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No Bidder may withdraw a bid within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the Owner and the Bidder determined by the Owner to be the lowest most responsible and responsive. Submission of a signed Bid by the Bidder constitutes acknowledgment of and acceptance of all the documents and terms and conditions of the Contractual-Legal Requirements and Technical Sections of the specifications in the Project Manual. The Contractor to whom the Work is awarded will be required to furnish an acceptable Performance and Payment Bond each in the amount of 100% of the contract price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents