Project Title | WMSRDC - Carpenter Brothers Infrastructure Project - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Muskegon, MI (Muskegon County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Removal of concrete pavement in the vicinity of the proposed biofilter. 2. Construction of a stormwater diversion structure. 3. Construction of an underground stormwater pretreatment vault. 4. Jack and bore storm sewer beneath railroad. 5. Construction of an outlet control structure. 6. Earth excavation and embankment fill. 7. Haul offsite and dispose of debris encountered during excavation in a type II landfill. 8. Placement of a PVC liner. 9. Import and placement of sand. 10. Planting of the biofilter with plugs and shrubs. 11. Filling, grading and/or berming of excess excavated material onsite. 12. All necessary soil erosion and sedimentation controls. 13. Cleanup and restoration of all disturbed areas. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |