Similar Projects
Hancock Sewer Repairs
Bidding
Hancock, MI

Campus Drive West Repairs
Bidding
Hancock, MI

Storm Sewer Basin
Post-Bid
Richmond, MI

2019 Sewer Rehabilitation
Post-Bid
Sturgis, MI

St. Johns Big Ditch Drain and Bond and Hansen Drain Improvements
Results
Saint Johns, MI

2018 Saw Grant Storm Sewer Cctv Investigation
Results
Less than $595,000 est. value
Harper Woods, MI

2020 Utility Improvements
Bidding
Ann Arbor, MI

Terrace Court, Lovell Place and Division Street
Post-Bid
Ionia, MI

2019 Storm Sewer Cleaning And Closed Circuit Television Cctv
Results
Less than $32,490 est. value
Garden City, MI

Construction of Bahweting Project Phase I
Post-Bid
Sault Sainte Marie, MI

Storm Sewer Maintenance
Results
Kalamazoo, MI

Storm Sewer Cleaning And Televising 2019
Post-Bid
Sturgis, MI

Sanitary and Storm Sewer Rehabilitation
Results
Owosso, MI

Capitol And Lenawee Construction
Post-Bid
Lansing, MI

Public Works On-Call Construction Services
Results
Ann Arbor, MI

Reported 03/06/2019 12:00 AM
Project Title

WMSRDC - Carpenter Brothers Infrastructure Project - Phase 2

Physical Address View project details and contacts
City, State (County) Muskegon, MI   (Muskegon County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description 1. Removal of concrete pavement in the vicinity of the proposed biofilter. 2. Construction of a stormwater diversion structure. 3. Construction of an underground stormwater pretreatment vault. 4. Jack and bore storm sewer beneath railroad. 5. Construction of an outlet control structure. 6. Earth excavation and embankment fill. 7. Haul offsite and dispose of debris encountered during excavation in a type II landfill. 8. Placement of a PVC liner. 9. Import and placement of sand. 10. Planting of the biofilter with plugs and shrubs. 11. Filling, grading and/or berming of excess excavated material onsite. 12. All necessary soil erosion and sedimentation controls. 13. Cleanup and restoration of all disturbed areas.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents