Similar Projects
Skunk Hollow Pond for Regional Downtown Area - STM 18 - City of Littleton
Infrastructure
Conception
$500,000 CJ est. value
Littleton, CO 80122

Rangeview Gulch Detention - STM 02 - City of Littleton
Infrastructure
Conception
$700,000 CJ est. value
Littleton, CO 80120

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Inverness Lane West Asphalt Rehabilitation 2021
Infrastructure
Results
Englewood, CO 80112

Piney Creek Lift Station Upgrades
Renovation, Infrastructure
Results
$4,182,300 CJ est. value
Aurora, CO 80011

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

DA Office Pavement Mill and Overlay/C&G Replacement - Arapahoe County
Infrastructure
Conception
$250,000 CJ est. value
Centennial, CO 80111

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

Goldsmith Gulch Final Phase Improvements - Huntington-Caley Open Space
New Construction, Infrastructure, Alteration
Post-Bid
Greenwood Village, CO 80111

Sheridan Safe Stops State Highway No. 88 and City Streets Project
Infrastructure
Results
$300,000 to $415,000 est. value
Sheridan, CO

RiverPark Mixed-Use Project / Littleton
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Littleton, CO 80120

Last Updated 05/24/2023 01:35 AM
Project Title

Mini-Roundabouts

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000319620 Question Acceptance Deadline 05/18/2023 05:00 PM EDT Questions are submitted online No The work performed under this contract will consist of reconstructing existing four leg intersections to be roundabout controlled. This project includes moving the curb line, sidewalk modification, landscaping work, installing concrete islands, pavement installation, and signing and striping at all locations. Base-Bid Locations: All work within this contract is to be completed per these Special Provisions, current City of Aurora Roadway Design and Construction Manual, and Colorado Department of Transportation (CDOT) Standard Specifications for Road and Bridge Construction. Substantial completion (all roadways must be completed) is to be established by December 31, 2023 and final completion by June 1, 2024. Work not specifically called for, but necessary to perform the contract work will be considered incidental to the contract whether specifically detailed or not. Buyers Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Contact Information Kristin Chewiwi 303-739-7105 kchewiwi@auroragov.org Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Kristin Chewiwi, Procurement Supervisor, at kchewiwi@auroragov.org AND Chris Stephan, Project Manager, at cstephan@auroragov.org. It is preferred that all inquiries be sent with the subject title: Mini-Roundabouts (5938A)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents