Similar Projects
174th Street, 66th Court and 173rd Place Roadway Improvements and Water Main Replacement
Infrastructure
Bidding
$625,000 est. value
Tinley Park, IL 60487

Southlawn Place and Westlawn Avenue Water Main Replacement
Infrastructure
Bidding
$800,000 est. value
Aurora, IL 60506

Sidewalk Replacement at Glenwood Acres 1 Apartments
Post-Bid
Salem, IL 62881

2021 Landscape Services
Post-Bid
Highland Park, IL

Parking Improvements at the Quincy Maintenance Yard / Sign Shop Parking Lot
Results
IL

County-Wide ADA Improvements of Curb Ramps for Sidewalks
Results
Lockport, IL 60441

Phase Vl-A and Vl-B Projects Including Pipe Culvert, Riprap, Tree and Brush Clearing, Elevated Walkway, Concrete Sidewalk, and Miscellaneous Items
Infrastructure, Alteration
Bidding
$60,000 est. value
Effingham, IL

Community Athletic Fields Concrete ADA Ramp
Post-Bid
Elk Grove Village, IL

2021 Parking Lot Replacements
Results
Lake in the Hills, IL

Pavement Removal, Excavation, Aggregate Subbase Improvement, Storm Sewer Rem
Infrastructure
Bidding
$500,000 est. value
Carol Stream, IL 60197

Removal and Replacement Existing Damage Sidewalk, Curb and Gutter
Post-Bid
Bartlett, IL

2021 Patching Program
Results
Moline, IL

2022 Sidewalk and Curb Replacement Project - Far West Area
Infrastructure
Bidding
$200,000 est. value
Joliet, IL

Alsip Boat Launch East Parking Lot Improvements
Post-Bid
Chicago, IL

Parking Lot Sealcoating
Term Contract
Results
Algonquin, IL

Last Updated 05/23/2022 05:07 PM
Project Title

2022 Miscellaneous Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Normal, IL   (McLean County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of approximately 40,000 square feet (SF) of Sidewalk Removal, approximately 39,000 SF of PCC Sidewalk construction, construction of ADA sidewalk ramps, sidewalk vertical displacement removal, driveway pavement reconstruction, storm sewer inlet adjustments and reconstruction along with all necessary items

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents