Similar Projects
Z--PEVI 200745 - Restore North and South Seawalls at Perry's Victory to Safeguard Site
New Construction, Term Contract
Design
$10,000,000 est. value
Put-in-Bay, OH 43456

Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

Bishopville Booster Station Replacement
Renovation
Bidding
$375,000 est. value
Glouster, OH 45732

Five Points Pump Station Improvement
Renovation
Bidding
OH

Buckeye Water District Raw Water Pump Station Improvements "Contract A" - Site, Pumps, Building "Contract B" - Electrical
Post-Bid
Wellsville, OH 43968

Small Pump Station Improvements
Post-Bid
Less than $800,000 est. value
Miamisburg, OH

Blue Fountain Lift Station Pump Replacement
Results
Gallipolis, OH 45631

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Glosser Road Pump Station and EQ Improvements
Renovation
Bidding
$9,750,000 est. value
Lebanon, OH 45036

Vayview, Planeview, and Murwood Lift Station Elimination
Post-Bid
$5,000,000 to $19,999,999 est. value
Xenia, OH

7th Street Sanitary Sewer Pump Station and Forcemain Project
Results
Waverly, OH

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Kexon Drive Extension
New Construction
Bidding
$2,645,052 est. value
Pioneer, OH 43554

Last Updated 02/24/2022 12:46 PM
Project Title

Sewer Modernization and Revitalized Treatment (Smart) Project

Physical Address View project details and contacts
City, State (County) OH   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of a new influent Pump Station at the existing Dryden Road Pumping and Pretreatment Facility, a Pretreatment Facility with screening and grit removal, and associated modifications at the existing Western Regional WRF including select demolition at the existing Dryden Road Pumping and Pretreatment Facility.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents