Similar Projects
SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

SR 138 - Culvert Preservation
Infrastructure
Design
$300,000 CJ est. value
Clarksburg, OH 43115

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 138/SR 207 - Two Lane Resurfacing
Infrastructure
Bidding
$1,441,973 CJ est. value
Chillicothe, OH 45601

Village of Bainbridge Sanitary Sewer and Wastewater Plant Construction
New Construction, Infrastructure
Post-Bid
Bainbridge, OH

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

World-Wide Water Storage Tank Remediation
Term Contract
Results

API 653 External Tank Inspection
Results

Roadway Minor Rehab - SR 41
Infrastructure
Design
$497,007 CJ est. value
Bainbridge, OH 45612

Dollar General #24769 / Richmond Dale
New Construction, Infrastructure - 10,640 SF
Bidding
$2,900,000 CJ est. value
Richmond Dale, OH 45673

Dollar General #24595 / Bournville
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Bourneville, OH 45617

WWTP Improvements Project
Renovation, Alteration
Results
$2,774,400 est. value
Frankfort, OH

Springfield Township Landslip Projects - TR242 Rocky Road Site 1
Infrastructure
Bidding
$3,525,499 CJ est. value
Springfield Township, OH 45601

Dollar General #21178 / South Salem
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Bourneville, OH 45617

CRCPL Site Improvement Project
Alteration
Results
$340,285 est. value
Chillicothe, OH 45601

Last Updated 12/08/2022 09:31 AM
Project Title

Chillicothe WWTP Improvements

Physical Address View project details and contacts
City, State (County) Chillicothe, OH 45601   (Ross County)
Category(s) Heavy and Highway, Laboratory, Sewer and Water
Sub-Category(s) Laboratory, Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $61,940,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of December 8 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Chillicothe Wastewater Treatment Plant (WWTP) Improvements The Project includes the following Work: Improvements to the Headworks including expansion, pumping, and screening; replacement of grit removal system; new secondary pumping station; new aeration tanks, blowers, clarifier, and splitter structure; replacement of RAS, WAS, and scum pumps; installation of UV disinfection and effluent pumping; updates to digester equipment; installation of dewatering equipment; laboratory renovations; site improvements; and yard piping. The Bid must be accompanied by Bid Guaranty and Contract Bond for the full amount of the Bid or Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. CONTRACTOR shall pay wages to each laborer and mechanic at a rate not less than the minimum wages specified in the current wage determination in accordance with the provisions of the Davis Bacon Act. Bidders shall comply with the President's Executive Order No. 11246, Equal Employment Opportunity as amended. The City of Chillicothe reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 110 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. The Strand Associates, Inc.(R) project manager is Travis P. Maupin, P.E., and can be contacted at Strand Associates, Inc.(R), 629 Washington Street, Columbus, IN 47201, (812) 372-9911 regarding the project. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. 1.3% of all contracts to MBEs and 1.0% of all contractsto WBEs. Work will be substantially complete within 1,096 calendar days; Final completion- 1,156 calendar days after the date when the Contract Time commences to run. Addendum #1-#7 have been issued as of 10-18-2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents