Similar Projects
Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Lincoln Avenue Widening - Keystone to Parker Road - Town of Parker
Infrastructure
Conception
$21,000,000 CJ est. value
Parker, CO 80134

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Millers Landing Hotel
New Construction, Infrastructure
Design
$89,500,000 CJ est. value
Castle Rock, CO 80104

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - General Contractors
Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Castle Rock, CO 80104

2022 Replacement Well A-1R project
Demolition, New Construction, Infrastructure
Results
$1,047,775 CJ est. value
Highlands Ranch, CO 80126

2022 Replacement Well A-1R project
Demolition, New Construction, Infrastructure
Results
$1,047,775 CJ est. value
Highlands Ranch, CO 80126

Castle Pines Village Infrastructure
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Castle Rock, CO 80108

Tall Tales Ranch / Lone Tree
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
Parker, CO 80134

Park Street & Wolfensberger Road Intersection - 77-44 - Town of Castle Rock
Infrastructure
Conception
$500,000 CJ est. value
Castle Rock, CO 80109

Cherry Creek at Dransfeldt Extension - Town of Parker
Infrastructure
Design
$5,000,000 CJ est. value
Parker, CO 80134

RFQ Contractor - Construction Manager/General Contractor (CM/GC)
Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Castle Rock, CO 80104

Roxborough Lift Station Pump P-201 Replacement
Renovation
Results
$260,000 est. value
Littleton, CO 80125

Ridgegate Southwest Village
New Construction, Infrastructure
Pending Verification
$440,000,000 CJ est. value
Lone Tree, CO 80134

Last Updated 07/26/2023 10:23 AM
Project Title

Pump and Motor Installation for Wells LDA-8, LDA-14, and DE-14

Physical Address View project details and contacts
City, State (County) Perry Park, CO 80118   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 6/13/2022 all bids are rejected and planning for a rebid. No rebid date yet. Question Acceptance Deadline 04/05/2022 06:00 PM EDT Questions are submitted online No Buyer's Requirements General Requirements - Bid Deposit Required - Contractors License Required - Warranty Information Required Bids must be submitted by electronic submission, which can be accessed through the Castle Pines Metro website at electronically. Bids must be submitted by the date and time designated in the Invitation to Bid. The Contract provides for the installation of pump and motor, all electrical equipment and connections, discharge piping and connections to existing raw water mains, all instrumentation and control in three water wells completed into the Lower Dawson aquifer (LDa-8 and LDa-14) and the Denver aquifer (De-14), all located within the Castle Pines Metropolitan District. Copies of the Bidding Documents may be obtained from accessible at elactronically. Bidding documents will be available on March 29, 2022. Bids must be submitted electronically by the deadline of April 12, 2022 at 4:00 PM. All submitted bids will be opened on April 12, 2022. No public bid opening will be held. Bids shall be on the form provided with these documents and accompanied by all documentation requested in Section 2 - Instructions to Contractor. Bids shall be submitted as directed in Section 2 - Instructions to Contractor The pre-bid meeting is mandatory for all contractors who plan to submit bids on the Lower Dawson Aquifer Well LDa-8, Lower Dawson Aquifer Well LDa-14, and Denver Aquifer Well De-14 Pump and Motor Contract. Work at the site is expected to commence by the Date to be specified in the Notice to Proceed. Completion of the Work is required as specified in the Bid Form, and to be specified in the Agreement and the Notice to Proceed. Bid security in the amount of five (5) percent of the total bid Price must accompany the Bid in the form specified in the Instructions to Bidders. Said bid security shall be forfeited to the owner as liquidated damages should the successful bidder fail to enter into a contract with the owner in accordance with the bid proposed as described in the bidding documents. The Bidder will be required to furnish a performance bond and a labor and materials payment bond. No bid may be withdrawn within a period of forty-five (45) days after the date fixed for Opening Bids. This Invitation to Bid is a solicitation and not an offer to contract. The owner reserves the right to reject any or all Bids, to postpone the award of the contract for a period not to exceed 45 days after the bid opening and to waive any informalities and irregularities in Bids, and to accept the proposal deemed most advantageous to the best interest of the owner.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents