Similar Projects
Pittsburgh Greenfield PreK-8 Restroom Renovations - Mechanical Construction
Post-Bid
Pittsburgh, PA 15210

Warren State Hospital - Boiler Upgrades and Steam Line Replacement
Post-Bid
Less than $7,000,000 est. value
Warren, PA 16365

North Pumping Station Mechanical Upgrades
Results
Enola, PA

Repair and Preventative Maintenance of Eight Parking Garages - Mechanical
Results
Reading, PA 19602

Sand Spring Wastewater Treatment Plant Upgrades- General/Process Mechanical
Construction
Less than $3,000,000 est. value
Schnecksville, PA 18078

Early Site Access at Pittsburgh International Airport - Mechanical Construction
Post-Bid
Pittsburgh, PA 15231

Crawlspace Mechanical Upgrades at Dubois Area High School
Results
DuBois, PA 15801

Phase 3 Interior Improvements at Parkway West Career - Mechanical Construction
Post-Bid
Oakdale, PA 15071

New Maintenance Garage - Mechanical Construction
Results
Wind Gap, PA 18091

Boiler Plant Stair Replacement
Post-Bid
$50,000 to $60,000 est. value
Slippery Rock, PA

CHP Project, Contract 02
Results
$615,000 est. value
Herminie, PA 16148

Steam Line Replacement - 11th Street
Post-Bid
Indiana, PA 15705

SCI Somerset - Upgrades to Mechanical and Security Systems
Results
Less than $3,056,000 est. value
Somerset, PA 15510

HVAC Replacement Project - Mechanical Construction
Post-Bid
Brownsville, PA 15417

Renovations and Addition for the Muncy Township Municipal Building - Mechanical Construction
Results
Less than $284,000 est. value
Muncy, PA 17756

Last Updated 05/24/2021 04:17 PM
Project Title

Office Renovations - Mechanical Construction

Physical Address View project details and contacts
City, State (County) Steelton, PA 17113   (Dauphin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to selective demolition, concrete work, CMU unit masonry, miscellaneous steel framing, wood blocking, interior wood trim, thermal insulation, EPDM roofing, acoustic batt insulation, aluminum storefront entrances, aluminum windows, glass and glazing, hollow metal doors and frames, solid core wood doors, door hardware, gypsum wallboard, ceramic tile, resilient flooring and accessories, carpet tile, plastic laminate casework, roller window shades, toilet accessories, toilet partitions, HVAC systems, plumbing systems, electric systems and other Work indicated in the Contract Documents, all systems complete and ready for use.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents