Similar Projects
Last Updated | 03/30/2020 11:49 AM |
Project Title | Bridge Rehablitation - Godown Road Culver |
Physical Address | View project details and contacts |
City, State (County) | Columbus, OH (Franklin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for this project consists of replacing the existing stone culvert carrying Godown Road over an unnamed stream and the adjacent timber pedestrian bridge located 0.5 miles north of Bethel Road. The new structure will be a 4-sided precast concrete box culvert with enough width to accommodate a future sidewalk along the west side of the roadway. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |