Similar Projects
Construction of a Five (5) Single-family Housing Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Green River, UT 84525

Family Dollar - FM 505 (TI Upfit)
Renovation, Infrastructure - 10,500 SF
Design
$150,000 CJ est. value
Green River, UT 84525

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

Construction of the Muddy Creek Irrigation
Infrastructure, Alteration
Results
Emery, UT

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

Sidewalk Project, 2022
Infrastructure
Post-Bid
$80,000 CJ est. value
Orangeville, UT 84537

CC and H Canal Pipeline Installation Project
Infrastructure
Results
$365,551 CJ est. value
Castle Dale, UT 84513

Farmington Bay Dyke-Line Restoration
Infrastructure
Post-Bid
$300,000 CJ est. value
Orangeville, UT 84537

Department of Natural Resources Green River State Park Campground and Lodging Expansion
Addition, Demolition, Infrastructure
Results
$3,676,951 CJ est. value
Green River, UT 84525

Applecross Station Visitor Center
Infrastructure
Post-Bid
$60,000 CJ est. value
Orangeville, UT 84537

Lower Miller Creek BDAs
Infrastructure
Results
$20,000 CJ est. value
Orangeville, UT 84537

Zion Mountain Local Service District - Applecross Station Visitor Center General Contractor - Main Building
New Construction, Infrastructure
Post-Bid
$170,000 CJ est. value
Orangeville, UT 84537

Castle Dale City Bike Trail Project 2023
Infrastructure
Results
$199,879 CJ est. value
Castle Dale, UT 84513

Fiber Connection From the Garfield County Sheriff's Office to the Cedar PSAP
Infrastructure
Post-Bid
$370,000 CJ est. value
Orangeville, UT 84537

Last Updated 09/18/2023 01:31 PM
Project Title

2023 Culinary Water Improvements

Physical Address View project details and contacts
City, State (County) Cleveland, UT 84518   (Emery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,220,474 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

North Emery Water Users Special Service District (NEWUSSD) (Owner) is requesting Bids for the construction of the following Project: 2023 Culinary Water Improvements. The Project includes the following Work: construction of a 250,000-gallon buried concrete water storage tank, installation of approximately 10,000 ft of culinary water pipe, installation of 7 pre-plumbed concrete valve vaults, SCADA controls, and related work. Bids will be received for a single contract. Owner anticipates that the Project's total bid price will be approximately $1,250,000. The Project has an expected duration of 150 days. The Project must start within 150 days of the award date. Question Deadline 09/01/2023

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents