Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

Street Improvement Project
Infrastructure
Bidding
$400,000 CJ est. value
Topeka, KS 66612

Street Improvement Project
Infrastructure
Bidding
$400,000 CJ est. value
Topeka, KS 66612

Guardrail
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Unincorporated, KS 66615

Guardrail
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Unincorporated, KS 66615

14th Street Improvements
Infrastructure
Post-Bid
Auburn, KS

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

Micro-Surfacing 2021
Infrastructure
Results
Topeka, KS

2021 City Wide Temporary Cap Replacement
Infrastructure, Alteration
Results
Topeka, KS

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Topeka Regional Business Center - Building 621 and 623 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

BRVB - Pavement Resurfacing and ADA Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Topeka, KS 66612

Last Updated 08/01/2022 05:06 PM
Project Title

Street Repair Project - SW 57 th Street S. Topeka Blvd west to City Limits - Cold Mill & HMA Overlay

Physical Address View project details and contacts
City, State (County) Topeka, KS 66609   (Shawnee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $98,791 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

ASPHALTIC CONCRETE SURFACING shall be completed in accordance with City of Topeka and Shawnee County Standard Technical Specifications, latest edition and addenda thereto. SC-1.1: Mix Designation: BM-2A SC-1.2: Mix Design Criteria: Principal / Minor Arterial SC-1.3: Asphalt Binder: PG 70-28 - Meeting requirements as specified in Section 1200 KDOT Standard Specifications SC-1.4: Asphalt for Tack Coats: SS-1HP - Meeting requirements as specified in Section 1203 KDOT Standard Specifications COLD MILLING EQUIPMENT: Contractor shall provide a self-propelled machine capable of cold milling asphalt pavement and loading milled asphalt pavement directly into trucks in one pass measuring 12 feet in width and 2 inches in depth. The cold milling machine shall be equipped with automatic grade and slope controls capable of maintaining a uniform grade and cross slope. PAVING OPERATIONS: Contractor shall install 2" of HMA in one lift on the milled surface. HMA shall be spread and finished to the specified crown and grade using an automatically controlled HMA Paver approved by the Engineer prior to paving operations. Operate the paver at a speed which shall provide a uniform rate of placement without undue interruption. At all times, keep the paver hopper sufficiently full to prevent non-uniform flow of the HMA to the augers and screed. Asphalt for Tack Coats: Contractor shall spray on the pavement surface receiving HMA a uniform coat of Emulsion Asphalt SS-1HP meeting the requirements as specified in Section 1203 Kansas Department of Transportation, Standard Specifications, latest edition and addendum. Application rate shall be 0.03 to 0.06 gallons per square yard. Contractor shall coordinate daily work efforts such that any milled surface will receive the first and final lift of new HMA before the work day is completed. Quantities bid are estimates only. Shawnee County reserves the right to increase or decrease quantities bid, as necessary, with no change to the Unit Price Bid. PAVEMENT MARKINGS PAINT shall be a water-borne marking paint including Glass Beads furnished in accordance with KDOT Standard Specifications for Roads and Bridge SECTION 2215 and applied in accordance with City of Topeka / Shawnee County Standard Technical Specifications SECTION 4 - Obstructions and Incidental Construction The Work will commence with an issuance of a Start Work Order by the Owner. The Contractor shall have twenty (20) calendar day from the date Start Work Order is issued by the Owner to have the project certified as being Substantially Complete and Ready for Final Payment and Acceptance. FINAL ACCEPTANCE and PAYMENT: For the project to be certified Ready of Final Acceptance and Payment the contractor shall have submitted a signed copy of both the Final Pay Application and Change Order reconciling "As Bid" verses "As Constructed" final quantities to the Owner.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents