Similar Projects
Prime Contracting Services for the Utilities Upgrades and Site Improvements Project Phase II
Bidding
Baltimore, MD

Cedar Branch North Fork Relief Sewer - Consent Decree
Bidding
$5,000,001 to $10,000,000 est. value
Ellicott City, MD 21228

Large Diameter Sanitary Sewer Interceptors and Siphons Condition Assessment and Analysis
Term Contract
Post-Bid
Less than $4,500,000 est. value
Baltimore, MD

On-Call Pipeline Grouting
Term Contract
Post-Bid
Towson, MD 21204

Emergency Repair of County-Owned Utilities
Term Contract
Results
MD

Small Business Set-Aside for Sewer Condition Assessment
Results
Adelphi, MD 20783

CCTV Inspection and Cleaning of Sanitary Sewers
Term Contract
Bidding
Frederick, MD

Repair Sleeves and Transition Couplings
Post-Bid
Laurel, MD 20707

Dundee Avenue to Kent Narrows Water Main Installation
Results
MD

Maintenance, Repair and Stabilization of Stormwater/Drainage Facilities
Term Contract
Bidding
$25,000 to $250,000 est. value
MD

Septic To Sewer Conversion Project
Post-Bid
Glen Burnie, MD 21060

Annual Inspection and Septic Pump-Out Service for Radio Shop's 1000 Gallon Septic Tank
Term Contract
Results
Less than $50,000 est. value
Catonsville, MD 21228

On-Call Water and Sewer Construction
Term Contract
Bidding
Bel Air, MD

Pipeline Infiltration and Inflow Reduction Project
Post-Bid
Fruitland, MD 21826

Maintenance, Repair and Installation of Enzyme Treatment System
Results
Towson, MD 21204

Last Updated 03/06/2020 06:50 AM
Project Title

Onsite Sewage Disposal System Replacement Ward Hill Salt Storage Facility in Cecil County

Physical Address View project details and contacts
City, State (County) Warwick, MD 21912   (Cecil County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,001 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the onsite sewage disposal system at the Ward Hill Salt Storage Facility located at 625 Cecilton Warwick Road (MD282), Warwick, Maryland. The work will consist of the following: (a) Project Management: Coordination of all aspects of the construction process including, but not limited to, subcontractor coordination and construction phasing. (b) Abandonment of existing 1,000 gallon septic tank in place as indicated on the drawings. (c) Locate existing leach field through the use of Closed-Circuit Television (CCTV) and test pitting; and abandon existing leach field. (d) Install new sanitary piping and 2,000 gallon concrete precast septic holding tank. (e) Install septic tank level indicator, high level alarm, alarm acknowledgement switch, shunt trip breaker, auto dialer system, and all electrical appurtenances to complete the work. (f) Contractor shall provide a Third Party Electrical Inspection to document and certify code compliance of the electrical system installation. Inspection shall be performed by a Maryland licensed electrical inspector.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents