Similar Projects
Jaeger Usa, Inc.Textile Tapes Storage Addition
Addition - 782 SF
Conception
Rochester, NH 03867

Thibeault Storage Building
Addition - 10,938 SF
Conception
Londonderry, NH 03053

Nylon Corporation Addition
Addition - 9,150 SF
Design
Manchester, NH 03101

Storage Building and Landscape Material Bins
New Construction - 720 SF
Design
Less than $500,000 CJ est. value
Rochester, NH 03867

Salt Containment Shed
Bidding
Bow, NH 03304

Public Storage #29163
Renovation
Bidding by Invitation
Nashua, NH

14` X 24` Shed
Post-Bid
Seabrook, NH

Construction Management at Risk Services for Building Renovations Farmington School District with a Stipulated Sum
Renovation
Post-Bid
Farmington, NH 03835

Construct Snow Removal Equipment Storage (SRES) Building
Results
Lebanon, NH

Patrol Shed Addition and Renovation
Renovation, Addition - 5,000 SF
Results
Less than $2,228,000 est. value
Manchester, NH 03101

Raytheon Expansions
Addition - 4,300 SF
Construction
Pelham, NH

Eastman Community Association - Phase III - East Lake - Phase II
New Construction - 6,200 SF
Construction
$595,207 est. value
Grantham, NH

Battery Energy Storage System (BESS)
New Construction - 300,000 SF
Pending Verification
$30,000,000 to $50,000,000 est. value
Littleton, NH 03561

Amazon Distribution Center
Build-Out
Pending Verification
Hudson, NH 03051

Warehouse
New Construction - 800,000 SF
Conception
$10,000,000 CJ est. value
Kingston, NH

Last Updated 02/26/2021 09:10 AM
Project Title

Spaulding High School Field Storage Building

Physical Address View project details and contacts
City, State (County) Rochester, NH 03867   (Strafford County)
Category(s) Commercial, Education
Sub-Category(s) Middle/Senior High School, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Rochester School District is seeking proposals for the complete construction of a new field storage building at the Spaulding High School.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents