Similar Projects
Samsung Semiconductor Chipmaking Plant
New Construction, Infrastructure - 6,000,000 SF
Design
$17,000,000,000 CJ est. value
Taylor, TX 76574

Samsung Semiconductor Chipmaking Plant
New Construction, Infrastructure - 6,000,000 SF
Design
$17,000,000,000 CJ est. value
Taylor, TX 76574

Costco New Warehouse / Georgetown
New Construction, Infrastructure - 160,437 SF
Post-Bid
$13,260,000 CJ est. value
Georgetown, TX 78628

Estates at Northgate Phase 1, Section 3, Paving, Drainage, and Water Improvements
Post-Bid
TX

Homestead at Old Settlers Park Phases 3, 5, 6, and 10
Results
Less than $5,496,690 est. value
TX

Emergency Interconnect Modifications and Automation
Results
Less than $88,000 est. value
Round Rock, TX

Holt Track Shop
New Construction, Infrastructure - 25,320 SF
Construction
$3,200,000 CJ est. value
Georgetown, TX 78628

QuikTrip 4183
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, TX 78628

Georgetown Firing Range / City of Georgetown Police Department Training Facility
New Construction, Infrastructure - 15,545 SF
Design
$2,800,000 CJ est. value
Georgetown, TX 78628

Parkside On the River Phase 2-1 and A Portion of Phase 2-2 Mud Masonry Wall
Post-Bid
Georgetown, TX

AMI Fixed Based Solution Project
Results
Florence, TX

Black Rock Coffee / Georgetown
New Construction, Infrastructure - 1,887 SF
Design
$700,000 CJ est. value
Georgetown, TX 78628

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Florence Range Resurfacing
Results
$159,601 est. value
Florence, TX 76527

Greenview Parkway Intersection Improvements
Post-Bid
Georgetown, TX

Last Updated 08/31/2022 12:32 PM
Project Title

Construction of Santa Rita Phase 1, Section 23

Physical Address View project details and contacts
City, State (County) Liberty Hill, TX 78642   (Williamson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $447,742 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CBD No. 5400 This Invitation for Bids is for the construction of SANTA RITA PHASE 1, SECTION 23. The work generally consists of Street Excavation, Drainage, Water, Wastewater and Erosion Control Improvements (the Project ). All questions, clarifications and requests regarding the project must be received in writing via email to Rob Hesley (rob@cbdeng.com) and received no later than 12:00 p.m., July 11, 2022. Any requests received after said time and date will not be addressed. The Bidder s surety will be forfeited and become the property of the Owner should the bidder fail to enter into a contract and furnish bonds acceptable to the Owner within 10 days after award of the contract. The Pre-Qualification Statement included in the proposal packet and as required by Williamson County M.U.D. No. 19A shall be completed in its entirety and submitted as part of the proposal. Any proposal lacking the Pre-Qualification Statement will not be considered. No Proposals shall be withdrawn for a period of 120 days after the opening of the bids. The Owner reserves the right to award a single Contract for both sections combined, or to award just one of the sections at this time, or to award individual sections as separate Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding. The Successful Bidder, if any, will be the responsible Bidder which in the Owner s judgment will be most advantageous to the Districts and result in the best and most economical completion of the Project. Contractor will provide to Williamson County, a maintenance bond in the amount of 10% of the cost of construction of the drainage within the subdivision that will remain in force for 2 years from the date of acceptance. This security must be payable to the County Judge, or his successors in office, of Williamson County, Texas. Contractor will provide the City of Liberty Hill a maintenance bond in the amount of 20% of the cost of construction of the wastewater that will remain in force for 1 year from the date of acceptance. The Contractor will provide to the City of Georgetown a maintenance bond in the amount of 10% cost of the water within the subdivision that will remain in force for 2 years from the date of acceptance. Contractor will provide to Williamson County M.U.D. No. 19A, a maintenance bond in the amount of 10% of the street excavation, drainage, water and wastewater that will remain in force for 1 year from the date of acceptance. Prevailing Wage Rates, in accordance with Government Code 2258 are applicable to this project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents