Similar Projects
2200 West Structures Project
Bidding
South Jordan, UT 84095

South Valley MS4
Term Contract
Bidding
Draper, UT 84020

Goose Creek Fire Riparian and Stream Restoration
Post-Bid
Salt Lake City, UT

Sandy Canal Trail 10600 South to Dimple Dell
Post-Bid
Sandy, UT

Prince of Wales Reclamation
Results
Less than $50,000 est. value
UT

Rose Creek Box Culvert
Results
Riverton, UT

Excavation, Ground Prep and Turf Installation Contract
Term Contract
Bidding
Salt Lake City, UT 84115

Drainage Pipe Installation and Road Repair
Term Contract
Post-Bid

2540 South Box Culvert Extension
Results
Less than $130,000 est. value
West Valley City, UT

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

DFCM Construction-Pre Qualified General-Heber Wells Main Drain Line Replacement
Results
Less than $330,544 est. value
Salt Lake City, UT 84114

Sandy Canal Trail Design 9400 South to Lazon Drive
Post-Bid
Sandy, UT 84094

Aqueduct Relocation at Bangerter Hwy at 6200 South TIF - Transportation Investment Fund
Results
$6,000,000 to $10,000,000 est. value
UT

Emigration Canyon Overlay
Post-Bid
$3,800,000 to $4,800,000 est. value
Salt Lake City, UT

Hper Mall Phase 1 - Storm Water Retention-Drainage Systems
Results
Less than $2,500,000 est. value
Salt Lake City, UT

Last Updated 02/20/2019 09:43 AM
Project Title

City Drain Crossing at Hunter Stables

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to installation of a 64 ft, 9X6 ft box culvert connecting the Hunter property to Rose Park Lane. This includes de-watering the canal during construction, earthwork, reconnection of two existing water services, installation of two 16-inch conduits for future water and sewer services, and demolition of the existing culvert structure.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents