Similar Projects
2021 Water and Sewer Systems Emergency Repair Services
Term Contract
Bidding
Mount Arlington, NJ

Lake Hiawatha Water Main Replacement Phase 1
Post-Bid
Parsippany, NJ 07054

Purchase of Water Fittings and Valves
Post-Bid
Morristown, NJ

Emergency Water Main Repair
Results
Randolph, NJ

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Herrick Drive Water Main Improvements Section-1
Post-Bid
Rockaway, NJ 07866

Water Meters/Data Recorders and Radio Frequency Meter Interface Units
Term Contract
Results
Randolph, NJ 07869

Plumbing Valve Replacement of the Riverview Apartments
Post-Bid
Boonton, NJ 07005

Howard Boulevard Water Main Installation
Results
$61,970 est. value
Randolph, NJ 07869

Customer Side Water Service Replacement Project
Post-Bid
Morristown, NJ 07963

Windemere, Altenbrand and Park Water Main Extension
Results
$721,800 est. value
Mount Arlington, NJ 07856

Elm Street Water Main Replacement Project
Post-Bid
Netcong, NJ 07857

Reservoir Avenue Water Main Improvements
Results
Randolph, NJ

Church and Academy Street Water Main Improvements
Infrastructure
Post-Bid
Rockaway, NJ 07866

2019 Water System Improvement
Results
Cedar Knolls, NJ 07927

Last Updated 10/05/2021 11:22 AM
Project Title

Replacement of Activated Carbon Filter Piping at the Water Treatment Facility

Physical Address View project details and contacts
City, State (County) Rockaway, NJ 07866   (Morris County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this Contract consists of furnishing of plant, equipment, superintendence, labor, skills, material and all other items necessary for the removal and replacement of the Finished Water Piping as detailed, or required in the Contract Documents. Several shut downs will be required to perform the work of this Contract. If the work is performed during the day the maximum shut down time will be THREE (3) hours in a 24-hour period. If the Contractor requires a longer shut down, the shutdown shall be performed between the hours of 10:00 PM and 6:00 AM, during low water demand. All work required under the Contract Documents shall be completed and ready within the timeframes as established in the Agreement.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents