Similar Projects
Water Main Replacement
Bidding
Elmwood Park, IL

Singer Avenue Water Main Replacement
Bidding
Less than $615,000 est. value
Lemont, IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

Revise Domestic Water System - Division 01
Bidding
Chicago, IL 60612

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

2021 Water Main Improvements & Street Resurfacing
Bidding
Evanston, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Term Agreement for Water Main Construction - District One
Term Contract
Results
Chicago, IL

Emergency Watermain and Sewer Services
Bidding
Park Ridge, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

Water Main Construction - District 4 (Project 20-604)
Term Contract
Results
Chicago, IL

Last Updated 07/22/2020 11:56 AM
Project Title

Well 2 Raw Water Main CIPP Lining

Physical Address View project details and contacts
City, State (County) Park Forest, IL 60466   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall consist of all labor, material, and equipment to reconnect the rehabilitated pipe to the existing pipe with 10” Ductile Iron restrained joint water main within the access pit. This cost shall include a 10”x 6” tee to install a fire hydrant within the footage. Work shall include but is not limited to: 4 inch bedding, haunching, and compaction with excavated material (if applicable), deflections over/under conflicts, installing fittings during course of installation, polyethylene wrapping of all pipe, valves, and fittings during course of installation, utilizing a restraining joint system for various lengths, thrust blocking, chlorination of pipe/fittings by swabbing.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents