Similar Projects
Repair Roads for Rebuild
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Tyndall AFB, FL 32403

Paving Improvements
Infrastructure
Bidding
$1,175,000 est. value
Callaway, FL

Front Beach Road Segment 4.1 Powell Adams
Post-Bid
Panama City Beach, FL 32413

PCB Parkway Sidewalk (North Pier Park Drive to Nautilus Street
Post-Bid
Panama City Beach, FL 32413

Callaway Point Drainage Improvement Project
Results
Callaway, FL 32404

Hombre Circle Culvert Improvements and Cleaning
Results
Panama City, FL 32407

Roadway Rehabilitation Phase V (Major Resurfacing - Local Roads)
Infrastructure
Bidding
$6,446,693 est. value
Panama City, FL

Restore CEMIRT Parking Area
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Panama City, FL 32403

City Hall (Old) and Library Demolition
- 17,900 SF
Results
Less than $134,040 est. value
Lynn Haven, FL 32444

Sidewalk/Drainage Improvements (BDI)
Infrastructure
Bidding
$871,353 est. value
P C Beach, FL 32401

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Front Beach Road Segment 3 and Highway 79
Results
Panama City, FL

Design/Build- Repair Sprung City Parking Lot on Tyndall AFB
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Panama City, FL 32403

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Street Resurfacing Project FY 2021
Results
Panama City Beach, FL 32413

Last Updated 07/07/2022 07:02 AM
Project Title

Resurfacing/Sidewalk/Drainage Improvements

Physical Address View project details and contacts
City, State (County) Panama City, FL 32461   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,862,354 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Bay Road Name: SR 75 (US 231) Limits: From Sr 30 (Bus 98/6th St) to Sr 30a (Us 98/15th St) Project(S): 43776215201(*) Federal Aid No: D321025B Project(S): 43776215202 Federal Aid No: N/A Total Roadway Length: 1.123 Miles Contract Days: 100 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.123 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 15 Calendar Days The improvements under this contract include the installation of a cross drain, ADA improvements, milling and resurfacing, and signing and pavement marking of SR 75 (US 231).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents