Similar Projects
Koz on 4th Avenue Apartments
New Construction - 344,000 SF
Conception
$10,000,000 CJ est. value
Spokane, WA 99204

Indian Trail Townhomes
New Construction, Infrastructure - 275,000 SF
Conception
$10,000,000 CJ est. value
Spokane, WA

Millennium On Monroe Apartments - Phase II
New Construction
Design
$7,500,000 est. value
Spokane, WA 99205

Mckinley School Mixed-Use Project
Renovation, Addition - 17,000 SF
Design
$4,000,000 est. value
Spokane, WA 99202

Bidwell Pool Replaster
Infrastructure
Post-Bid
$50,000 est. value
Colbert, WA 99005

Pedestrian Ramp Replacement
Infrastructure
Post-Bid
Deer Park, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Cedarwest Apartments Unit Renovations
Renovation
Results
Spokane, WA 99205

Nora Avenue Apartments
New Construction - 36,806 SF
Construction
$4,000,000 est. value
Spokane Valley, WA 99206

Millennium On Monroe Residential Mixed-Use Development - Phase I
New Construction - 40,700 SF
Construction
$8,000,000 est. value
Spokane, WA 99205

Historic Chancery Building demolition and Apartment Complex
New Construction, Demolition - 37,000 SF
Pending Verification
Spokane, WA 99201

The Park at Medical lake
New Construction - 24,700 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Medical Lake, WA

Zacher Apartments
New Construction - 7,800 SF
Conception
$2,000,000 est. value
Spokane, WA 99201

Millenium North Hill
New Construction - 49,900 SF
Design
$10,500,000 est. value
Spokane, WA

Evergreen Road Preservation
Infrastructure
Post-Bid
Spokane Valley, WA

Reported 04/04/2022 01:33 PM
Project Title

Derek Apartments Phase 1

Physical Address View project details and contacts
City, State (County) Spokane Valley, WA 99206   (Spokane County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Sidewalks/Parking Lot, Swimming Pool(s)
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project’s first phase consists of a 254-unit apartment complex with a pool house and 430 parking spaces on more than 5 acres

Details

2 Apartments/Condominiums, 4 Stories Above Grade, 200,000 SF New Construction, 254 Unit(s), 5 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents