Similar Projects
Piper Lake North
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Kansas City, KS 66109

Piper Lake North
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Kansas City, KS 66109

Central Avenue High Rise Apartments
New Construction
Design
$41,000,000 est. value
Kansas City, KS 66101

The Madison
New Construction, Infrastructure
Design
$90,000,000 CJ est. value
Kansas City, KS 66104

The Hudson - Apartments and Parking Garage - Rebid
New Construction, Infrastructure - 330,850 SF
Bidding
$60,000,000 CJ est. value
Kansas City, KS 66103

The Hudson - Apartments and Parking Garage - Rebid
New Construction, Infrastructure - 330,850 SF
Bidding
$60,000,000 CJ est. value
Kansas City, KS 66103

New Piper High School Project
Addition, Demolition, New Construction, Infrastructure - 115,000 SF
Sub-Bidding
$31,000,000 CJ est. value
Kansas City, KS 66109

Turner`S Logistic Center West
New Construction
Post-Bid
Kansas City, KS

Elevator Modernization at Bethany Park Towers
Renovation
Post-Bid
Kansas City, KS 66102

Hansen Pavement Refurbishment
Infrastructure
Results
$343,600 CJ est. value
Kansas City, KS 66106

North Park Restroom
New Construction, Infrastructure
Results
$98,798 CJ est. value
Bonner Springs, KS 66012

Village West Apartments III
New Construction, Infrastructure
Construction
$120,000,000 CJ est. value
Kansas City, KS 66109

Village West Apartments III
New Construction, Infrastructure
Construction
$120,000,000 CJ est. value
Kansas City, KS 66109

Fairfield Inn & Suite Marriott / Kansas City
New Construction, Infrastructure - 68,242 SF
Pending Verification
$15,000,000 CJ est. value
Kansas City, KS 66111

West 39th Avenue Apartments
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Kansas City, KS 66103

Last Updated 11/21/2022 12:04 PM
Project Title

505 Central

Physical Address View project details and contacts
City, State (County) Kansas City, KS 66101   (Wyandotte County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Misc. Recreational, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for an eight story 129-unit apartment building. Amenities include a rooftop swimming pool, gym and a game room. As of November 2022, this project is in the final planning stages, and received approval from the Wyandotte County. No further plans or applications have been submitted for review at this time. The Developer is finializing the contract with the general contractor, however, information regarding the architect was not disclosed. Construction is expected to start late Spring or early Fall 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

8 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents