Similar Projects
2021 Preventive and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO 80202

North Public Road Sanitary Sewer Main Extension
Post-Bid
Lafayette, CO 80026

Sand Traps - On-Call Single Trade Services
Post-Bid
Denver, CO 80202

35th Street and Lincoln Park Sanitary Improvements
Results
Less than $2,015,784 est. value
Denver, CO 80202

2019 Sanitary Sewer Improvements
Results
Less than $1,000,000 est. value
Lakewood, CO 80228

Candelas Community Commercial Parcels, Candelas Medical Phase 2 Utilities Project
Post-Bid
Arvada, CO

Ridge Gate Happy Canyon Trunk Sanitary Sewer
Results
Lone Tree, CO

Quarterly Grease Trap Pumping
Post-Bid
Florence, CO 81226

23 Road Sewer Trunk Line Extension Project
Results
Less than $500,000 est. value
Grand Junction, CO

2019 Manhole Rehabilitation
Post-Bid
Sterling, CO 80751

Miller Sanitary and Reuse Pipelines
Results
Less than $1,427,052 est. value
Lafayette, CO

Installation of The A-12 to A-12A-2 Sanitary Sewer Replacement
Post-Bid
Aspen, CO 81611

Leon Sreet Sanitary Sewer Project
Results
$30,000 est. value
Delta, CO

2020 Sewer Trenchless Point Repairs
Post-Bid
Salida, CO 81201

2020 SACWSD Wastewater System Rehabilitation
Results
Commerce City, CO 80022

Reported 08/15/2020 12:00 AM
Project Title

Boys and Girls Club Sewer Line Replacement

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. To replace the damaged sewer line at the Boys and Girls Club building. The sewer line runs from the north side of the building across Main Street to a manhole in the southbound lanes. 2. Replacement and bedding of approximately 60 ft. of 4” diameter schedule 40 sewer line. In order to complete this project it will require CDOT permitting and traffic control as well as Saw cutting, dowelling, and setting rebar for the replacement of 12 inch thick concrete panels in the middle of main street. Saw cutting and possible replacement of side walk and curb and gutter. As well as haul off and disposal of materials. The project may also require core drilling of the manhole where the sewer line will need to tie into the City sewer system in the middle of Main Street. Contractor will be responsible for all permitting.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents