Last Updated 10/23/2020 10:48 AM
Project Title

12th Street and Clay Avenue Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Waco, TX 76700   (McLennan County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $99,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall replace and extend an existing 6” sanitary sewer main in the alley connecting 12th and 13th Street between Clay Ave. and Burnett Ave. by installing approximately 252 LF of 8” SDR-26 PVC sanitary sewer main, 2 new 48’ diameter manholes, and 8 sanitary sewer services with two-way cleanouts. The contractor shall verify the pipe depths and locations of the existing sanitary sewer services and gas main crossings by conducting potholes during pre-construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents