Similar Projects
Presidential Lane Extension
Bidding
Sanford, ME 04073

Pavement Rehabilitation, Guardrail and Clear Zone Improvements MM 35.3 to MM 42.0
Results
Less than $8,300,000 est. value
Saco, Scarborough, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Alfred, Arundel, Biddeford, Lyman, ME 04002

Pavement Milling and Cyclical Pavement Resurfacing
Results
Kennebunk, ME 04043

Pavement Milling and Cyclical Pavement Resurfacing
Results
Limerick, ME 04048

(LCP) Light Capital Paving
Results
Berwick, Cornish, Hollis, Limerick, Newfield, North Berwick, Parsonfield, Shapleigh, ME

On Call Maintenance Paving/Located in Regions 1-5
Results

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,062,000 est. value
Biddeford, Saco, ME 04072

Highway Safety Improvements
Results
Sanford, ME 04073

Merrifield Drive Rehabilitation Project
Results
Kennebunk, ME

Pavement Milling, Ultra-Thin Bonded Wearing Course, with Safety Improvements
Results
Less than $3,404,000 est. value
Cornish, Limington, Parsonfield, Standish, ME 04071

Crack Sealing
Results
Cape Elizabeth, Falmouth, Kennebunk, Lebanon, North Berwick, Old Orchard Beach, Portland, Saco, Sanford, Scarborough, South Berwick, South Portland, Wells, Westbrook, Windham, ME 04101

Bituminous Paving for the 2020 Season
Term Contract
Results
Lebanon, ME

On Call Milling Machines and Grinders
Results

Bituminous Paving for the 2020-2021 Fiscal Year
Term Contract
Results
Lebanon, ME

Reported 04/30/2021 12:00 AM
Project Title

Westside Village Reconstruction Project

Physical Address View project details and contacts
City, State (County) Sanford, ME   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes full reconstruction of the following roadways within the Westside Neighborhood: Kimball Street, Prescott Street, Twombley Road, and Shaw Street. Berwick Avenue reconstruction is included in the plans, proposal, and bid book as a Bid Alternate. Roadway work includes new pavement, gravels, drainage, slipform concrete curb, fencing, retaining walls, signing, striping, and other incidental work. In addition to the roadway work noted above. This project includes sewer work on Kimball Street, Prescott Street, and Shaw Street. This includes replacing and/or removing approximately 1,900 linear feet of existing sewer pipe and reconnecting/replacing all the sewer laterals that are impacted.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents