Similar Projects
Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Arapahoe County Covered Walkways
Post-Bid
Centennial, Littleton, CO 80120

Ramp Safety Improvements at the Southbound I-225 at Parker Road
Results
$1,000,000 to $5,000,000 est. value
CO

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Lone Tree Creek Regional Trail Phase 1B
Infrastructure
Post-Bid
Centennial, CO

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Lone Creek Regional Trail Phase 1A
Results
Less than $1,004,305 est. value
Centennial, CO 80112

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Replace Curb Ramps in Region 1
Results
$1,000,000 to $5,000,000 est. value

Last Updated 09/01/2021 02:38 PM
Project Title

25th Avenue Pedestrian Boulevard Construction

Physical Address View project details and contacts
City, State (County) Aurora, CO 80040   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000 to $1,049,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 25th Avenue Pedestrian Boulevard Construction project involves construction of a 10-foot pedestrian boulevard on the north side of 25th Avenue between Fulton Street and Iola Street located in Aurora, Colorado. Work performed shall include, but is not limited, to: 1. Relocating the existing curb line to narrow the street from a 40-foot section to a 36-foot section. The relocated curbs narrow the travel lanes from 12 feet to 10 feet, maintaining on-street parking. 2. The project also includes crosswalks to access the north side of 25th Avenue. The existing curb ramps at the pedestrian signal east of Hanover Street will be reconstructed to current City standards. 3. The pavement markings for the signal will be reinstalled.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents