Similar Projects
Oakville Middle School HVAC - Mehlville School District
Renovation
Conception
$470,000 CJ est. value
Saint Louis, MO 63129

High School Library
Renovation - 10,000 SF
Design
$1,500,000 est. value
Clayton, MO 63105

District-Wide Building Automation System Modernization Project
Renovation
Design
$1,500,000 est. value
Byrnes Mill, MO 63025

2022 Summer Work District Wide Bid Package A
Renovation
Post-Bid
Chesterfield, MO

NHS Central and East Halls Interior Improvements
New Construction
Post-Bid
Less than $11,000,000 est. value
Hanley Hills, MO 63133

Additions and Alterations to Bernard Middle School, Oakville Elementary School, Point Elementary School, Rogers Elementary School
Renovation, Addition - 125,432 SF
Results
$10,000,000 est. value
Mehlville, MO 63129

Clayton High School Library Renovation
Renovation
Results
$600,000 est. value
Clayton, MO 63105

April 2021 Proposition R Bond - Kirkwood School District
Addition, Renovation
Pending Verification
$61,262,600 CJ est. value
Kirkwood, MO 63122

2022 Bond - Webster Groves School District
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Webster Groves, MO 63119

Bernard Middle School Security Entrance - 2021 Bond Proposition S - Mehlville School District
Renovation
Design
$350,000 CJ est. value
Saint Louis, MO 63129

2022 Summer Work District Wide - BP B
Renovation, Addition
Post-Bid
Ballwin, Chesterfield, Manchester, Maryland Heights, MO 63043

Interior Renovations to Holman and Pattonville Heights Middle Schools - Pattonville School District
Renovation
Results
$4,000,000 est. value
Maryland Heights, Saint Ann, MO 63074

Bernard Middle School Outdoor Lighting - 2021 Bond Proposition S - Mehlville School District
Infrastructure
Design
$300,000 CJ est. value
Saint Louis, MO 63129

Affton High School and Rogers Middle School Bathroom
Renovation
Post-Bid
Affton, MO 63123

District Asphalt Projects
Infrastructure
Results
$188,649 CJ est. value
Webster Groves, MO 63119

Last Updated 04/27/2023 03:15 PM
Project Title

Dental Sciences Lab at North Technical High School

Physical Address View project details and contacts
City, State (County) Florissant, MO 63033   (Saint Louis County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from Copy Center - 02/28/23
Owner View project details and contacts
Architect View project details and contacts
Description

*As of March 15, 2023, addendum 2 has been issued.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents