Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

Southern Service Area Lift Station - 19-PWSew-002 - Village of Huntley
Infrastructure
Conception
$2,850,000 CJ est. value
Huntley, IL 60142

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Reconstruct Souwanas Trail
Infrastructure
Bidding
$5,907,383 CJ est. value
Algonquin, IL 60102

Knox Park Parking Lot Rehabilitation
Infrastructure
Post-Bid
McHenry, IL

Phase III Construction Engineering Services for North Main Street Improvement
Infrastructure
Post-Bid
Crystal Lake, IL 60014

McCullom Lake Road Improvements
Infrastructure
Results
McCullom Lake, IL 60050

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

AZE Distribution Center
New Construction, Infrastructure - 175,600 SF
Pending Verification
$19,000,000 CJ est. value
Huntley, IL 60142

Enclave Apartments and Town Homes
New Construction, Infrastructure - 7,100 SF
Pending Verification
$20,000,000 CJ est. value
Crystal Lake, IL 60014

McHenry County SportsPlex / Lakewood Community Center / Chicagoland Sportsplex
New Construction, Infrastructure - 150,000 SF
Design
$45,000,000 CJ est. value
Woodstock, IL 60098

Last Updated 02/16/2023 11:13 AM
Project Title

Sidewalk, Curb and Gutter, Decorative Brick Crosswalks and Banding, ADA Ramps

Physical Address View project details and contacts
City, State (County) Harvard, IL 60033   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County : Harvard Description : Project includes pavement removal, full depth bituminous pavement, aggregate subgrade improvement, sidewalk, curb and gutter, decorative brick crosswalks and banding, ADA ramps, detectable warnings, and all incidental and collateral work to complete the project. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. Project Location: Ayer Street, between Washington Street and Park Street in the City of Harvard, Illinois. ILDOT - Sidewalk, Curb and Gutter, Decorative Brick Crosswalks and Banding, ADA Ramps - 22-00069-00-MS

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents