Similar Projects
Industrial Park South and TH 71 South End Storm Sewer Improvements
Term Contract, Infrastructure
Bidding
Minneapolis, MN

North Smoky Hills Graveling
Renovation
Post-Bid

2021 Concrete Paving Rehabilitation
Post-Bid
Minneapolis, MN

CSAH 34 (Birch Street) Improvements
Results
Lino Lakes, MN 55014

CSAH 116 (Bunker Lake Boulevard) at TH 47 (St Francis Boulevard) Intersection Improvements
Results
$3,700,000 est. value
Ramsey, MN 55303

Regional Trails and Pathways Rehabilitation
Renovation
Post-Bid
Minneapolis, MN

2021 Street Improvements
Results
$2,300,000 to $2,700,000 est. value
Lino Lakes, MN

Whittier Safe Routes to School
Infrastructure
Post-Bid
Minneapolis, MN

Grading, Bituminous Surfacing, Signals, ADA Improvements, TMS and Bridge No. 02552
Results
MN

Furman Street Improvements
Results
$115,000 est. value
Columbus, MN 55025

Crooked Lake Boulevard and Robinson Drive Mill and Overlay
Results
Coon Rapids, MN 55433

Hornsby Street Reconstruction
Results
$1,800,000 to $2,000,000 est. value
Columbus, MN 55025

2021 Crack Seal Improvements
Results
$165,000 est. value
Ramsey, MN

Riverdale Drive Improvements
Results
Ramsey, MN 55303

2021 Mill and Overlay and 2021 Curb, Sidewalk and Ped Ramp Repairs
Results
$2,276,000 est. value
Anoka, MN

Last Updated 10/14/2021 04:37 PM
Project Title

2021 Street Improvements

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Anoka County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of removals, water main replacement, storm sewer repairs, concrete repairs, excavation, aggregate base, bituminous paving, pavement markings, and restoration items. The project area is generally 2nd Avenue SW (between 2nd St. and Hwy 23) and Third Street SW (between 3rd Ave. and Central Ave.)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents